Laserfiche WebLink
<br />, <br />. <br />. <br />. <br />. <br />. <br />~ <br />. <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />t <br />. <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />. <br />. <br />. <br />. <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />. <br /> <br />2.0 SPILL WA Y/OUTLET STRUCTURE CONSTRUCTION SUMMARY <br /> <br />The concrete spillwayloutlet structure was founded on undisturbed claystone bedrock. All excess <br />water and degraded bedrock material was removed before the base slab was poured. Reinforcing <br />rebar was placed in the excavated foundation with bent bars extending into the structure walls. A six- <br />inch PVC waterstop was cast into the foundation around the base of the spillway shaft walls. <br />The new spillway structure has 12-inch thick walls with two layers of rebar reinforcement. The wall <br />reinforcement was tied to the foundation reinforcement. A 42-inch RCP inlet pipe was cast into the <br />southerly outlet works shaft wall, and the 30-inch diameter ductile iron pipe was cast into the <br />northerly spillway shaft wall. Two rebar hoops were placed around each of the pipes. Waterproofing <br />material was placed on the outside face of the spillway shaft walls up to the highwater line (gauge <br />height 9.7) of the reservoir. Both shafts contain manhole steps for access should any inspections or <br />maintenance need to be performed. All exposed corners were chamfered. <br /> <br />A 30-inch by 30-inch Waterman Series S-3000-F-Y self-contained square, medium duty sluice gate, <br />with a handwheel operator, was installed between the spillway and the outlet shafts. The gate frame <br />was sealed against the northerly outlet shaft wall using non-shrink grout and a thin layer of epoxy. The <br />gate was field tested for leakage, and met the leakage standard in the project specifications. <br />Hot dipped galvanized trash racks and grates were bolted to the top of the spillway structure. A three <br />and one-half foot, locking chain link fence was placed around the spillway structure to help prevent <br />uncontrolled access. A staff gauge was placed on the inside of the west wall of the outlet shaft with <br />0.00 gauge height corresponding to the invert elevation of the outlet pipe. <br /> <br />3.0 OUTLET WORKS PIPE CONSTRUCTION SUMMARY <br /> <br />The existing outlet works structure was removed, and the dam embankment was breached. The <br />excavated embankment soils were stockpiled for reconstruction ofthe dam. All organics, large rocks, <br />and tree roots greater than one-inch in diameter were removed before the eKcavated soils were <br />stockpiled. The outlet works pipe is composed of four sections (74 feet) of ductile iron restrained joint <br />pipe placed at a 0.3 percent grade. The outlet pipe was cast into the northerly spillway shaft wall on <br />the upstream side of the dam, and into the reconstructed concrete headwall of the outlet channel on <br />the downstream side of the dam. A 12-inch thick reinforced concrete cutoff wall was constructed at <br />outlet works Station 0 + 88. The cutoff wall extended a minimum of 24 inches out from the outlet <br />pipe. A non-reinforced concrete cradle was placed to the pipe springline. Four sacrificial anodes <br />were placed at outlet works Station 1 + 14. All of the pipe sections were connected with two bond <br />wires. Soil under the concrete cradle was excavated to bedrock. Soil placed beneath the concrete <br />cradle was compacted to a minimum of 98 percent of the maximum dry density as determined by the <br />Standard Proctor test as described in ASTM D698. Soil used in the dam embankment reconstruction <br />over the pipeline was compacted to a minimum of 95 percent of the maximum dry density. <br /> <br />FINAL CONSTRUCTION REPORT - Davis No.1 Dam <br />Outlet Works and Spillway Rehabilitation <br /> <br />-2- <br /> <br />May 2001 <br />!:\OO57 _059.mjb\Conslruction Report\Construction.rpt.wpd <br />