Laserfiche WebLink
<br />/ <br /> <br />STATE OF COLORI\DO <br /> <br />hnp://water .state.co,us/defau It.htm <br />March 17, 2000 <br /> <br />REC~n'eJ') <br /> <br />MAN 22.... il if) <br />( <br />Cons", . <br />~......." '-vd(Q <br /> <br /> <br />WATER DIVISION 2 <br />OFFICE OF THE STATE ENGINEER <br /> <br />310 East Abriendo, Su ite B <br />Pueblo, Colorado 81004 <br />Phone: (719) 542-3368 <br />FAX: (719) 544-0800 <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Hal D, Simpson, PL <br />Slate Engineer <br /> <br />Robert V. Trout <br />Trout & Raley, P.C. <br />1775 Sherman Street <br />Suite 1300 <br />Denver, CO 80203 <br /> <br />Steven J, Wille, P,E. <br />Division Engineer <br /> <br />RE: BLACK HILLS RESERVOIR <br />LETTER OF UNDERSTANDING <br /> <br />Dear Bob: <br /> <br />Thank you for your February 25, 2000 letter that summarizes our agreement for administration <br />of Black Hills Reservoir. I believe you letter accurately describes our mutual understanding of <br />the requirements with a few minor revisions. The additional language is emphasized as follows: <br /> <br />3. Model will install a continuous stage-recording device to measure the surface <br />elevation of the Black Hills Reservoir. In addition, Model will conduct a survey of <br />the contour lines ofthe reservoir with a vertical interval of no more than one foot, and <br />prepare tables relating estimated capacity and surface area to water surface elevation <br />in O.OI-foot increments from the lowest point in the reservoir to at least the bottom of <br />the spillway. This information will be submitted to your office. <br /> <br />4. Model will construct a channel section (to be hydraulically rated) in the Model Ditch <br />below the outlet from the Black Hills Reservoir capable of measuring the Inaximum <br />design outlet capacity of250 cfs, and install a continuous recording device to measure <br />the approximate water surface elevation in the rated channel section and install a <br />readily observable staff e:aue:e. In addition, Model will provide a rating table <br />relating water elevation in the channel section to discharge. <br /> <br />5. Model will construct aft additional waste way capacity from the Model Ditch below <br />the Black Hills Reservoir, either at the loeation of the Furness Arroyo or Waste Way <br />#l,so that there is a total combined waste way capacity at the current location of <br />Waste Way # 1 and the Furness Arroyo of 110 cfs. In addition, if Model enlarges <br />Waste 'Way 1fl, Model will increase the capacity of the waste channel from Waste <br />Way #1 to Black Hills Arroyo to the capacity of the enlarged waste way, which shall <br />be desie:ned to pass at least 70 crs. Finally, Model will equip each waste way with a <br />