My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01938
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01938
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:48 AM
Creation date
7/2/2007 11:17:41 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150012
Contractor Name
Model Land and Irrigation Company, The
Contract Type
Loan
Water District
19
County
Las Animas
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'--. .~ <br /> <br />Mr. Steve Witte <br />May 17,2000 <br />Page 3 <br /> <br />recorder and the rated section with a flow recording device near the downstream <br />toe of the dam. <br /> <br />b. Installation of new gates at the Furness Arroyo waste way will be completed by <br />about May 22, 2000. <br /> <br />c. Installation of the flow recording device at the flume at Earl will be completed by <br />about May 22,2000. <br /> <br />d. The reservoir area capacity survey will be completed and submitted to the State by <br />May 5, 2000. <br /> <br />e. Installation of a flume or engineered channel section downstream of the Furness <br />Arroyo waste way will be completed by about June 30,2000. <br /> <br />f. The schedule for the canal loss study will depend on the availability of the State <br />Hydrographer staff <br /> <br />10. Upon completion of the work described in paragraphs 9.a., 9.b., and 9.c. above, Model <br />may resume its nonnal operation of the Model Ditch system in accordance with the <br />provisions of Rule 10 of the State Engineer's Rules and Regulations for Dam Safety and <br />Dam Construction. <br /> <br />11. We understand that your office will not object to the disbursement of loan funds by the <br />Colorado Water Conservation Board to Model in accordance with standard procedures, <br />including final payment upon satisfactory completion of the work described in paragraphs <br />9.a. through 9.e. above; except that the final $50,000 in loan funds will be released in <br />accordance with the following schedule: <br /> <br />a. Release of $30,000 will be approved upon satisfactory completion of the work <br />described in paragraphs 9.a., 9.c. and 9.d. above. <br /> <br />b. Release of$15,000 will be approved upon satisfactory completion of the work <br />described in paragraph 9.b. above. <br /> <br />c. Release of the final $5,000 will be approved upon satisfactory completion of the <br />work described in paragraph 9.e. above. <br /> <br />Could you please indicate to me in writing at your earliest convenience whether this letter <br />accurately summarizes our agreement to satisfy the condition of the pending Colorado Water <br />
The URL can be used to link to this page
Your browser does not support the video tag.