My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150154 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150154 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:58:50 AM
Creation date
7/2/2007 8:34:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150154
Contractor Name
Pine River - Bayfield Ditch Company
Contract Type
Loan
Water District
31
County
La Plata
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Permitting <br /> <br />The Pine River Bayfield Ditch Company is currently working with the CORP of Engineers office in / <br />Durango, Colorado to complete the 404 (b)(1) permitting process. No delays are anticipated in <br />the replacement schedule that would be attributed to the permitting process. <br /> <br />The rights-of-way associated with each alternative have been discussed with the three property <br />owners that would be impacted by the siphon replacement. All landowners are in agreement and / <br />have committed to cooperating with the Pine River Bayfield Ditch Company in the replacement ../. <br />effort. <br /> <br />Institutional Considerations <br /> <br />Entities that are, or may be, involved in the design, construction, and financing of the project <br />include: <br /> <br />PRB Ditch Company: financing and project management. <br />Natural Resources Conservation Service (NRCS): surveying, design and construction. <br />Colorado Water Conservation Board (CWCB): financing and construction, <br /> <br />The PRBDC will be the lead for the financing, design, and construction of the project and will be <br />the entity entering into contracts and agreements with the various entities for the services <br />provided by each. <br /> <br />Financial Analysis <br /> <br />Three entities will be involved in financing the estimated total project cost of $267,000. The <br />PRBDC is applying for a loan from the CWCB in maximum amount of $200,000. The actual or <br />estimated amounts by entity are given in Table 2. <br /> <br />Table 2. Sources of Funding <br /> <br />Entity Grant Loan Percent <br /> Participation <br />CWCB $0 $200,000 76% <br />PRBDC $0 $0 0% <br />NRCS $50,000 $0 18% <br />Totals $50,000 $200,000 <br /> <br />~P <br />t ('7, oOU <br /> <br />The PRBDC will cover any costs that exceed the estimated project cost. <br /> <br />PRB Ditch Company <br />Siphon Replacement Feasibility Study <br />May 2003 <br /> <br />Page 13 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.