Laserfiche WebLink
<br />Cost Estimate <br /> <br />The estimated total project cost is $368,250. <br /> <br />Item Estimated Cost <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />Total Cost <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />$ 4,000 <br />$364,250 <br /> <br />$368,250 <br /> <br />Estimated Cost <br /> <br />1. Drill New Recharge Well <br />2. Refurbish Old Recharge Well <br />3. 21" PVC Pipe (4500 linear feet) <br />4. 12" PVC Pipe (2200 linear feet) <br />5. Pipeline Appurtenances <br />6. New Recharge Pond Construction <br />7. Electricity for Wells <br />8. Land Under Recharge Ponds (100 acres) <br />9. Land Under Pipelines & Wells (5 acres) <br />10. Surveying <br />11. Contingency <br />12. Planning and Design Costs <br /> <br />Total Cost <br /> <br />Implementation Schedule <br /> <br />$ 46,000 <br />$ 10,000 <br />$ 75,600 <br />$ 15,400 <br />$ 30,000 <br />$ 15,000 <br />$ 9,000 <br />$112,000 <br />$ 7,500 <br />$ 2,750 <br />$ 41,000 <br />$ 4,000 <br /> <br />$368,250 <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />~Complete Final Design <br />2. Start Construction <br />3. Complete Construction <br />4. Project is Operational <br /> <br />Feasibility Study <br />Guenzi Aug Project <br />April 2004 <br /> <br />6 <br /> <br />Date <br />06/01/04 <br />06/02/04 <br />07/01/04 <br />07/02/04 <br />