My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10360 (2)
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10360 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:41:20 PM
Creation date
6/26/2007 11:50:12 AM
Metadata
Fields
Template:
Floodplain Documents
County
Washington
Community
Otis
Title
Preliminary Design, SW Drainageway, Railroad to Washington Street, Town of Otis Colorado
Date
1/1/1997
Prepared For
Otis
Prepared By
McLaughlin Water Engineers, Ltd.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />from south of Spruce Street on Washington. It may be feasible to regrade Washington from Spruce Street <br />south to Rose Street which could improve the drainage to Spruce Street, and include lowering Spruce to <br />the east to tie into the proposed work from Vine Street to the alley west of Vine, These items can be <br />pursued further during fmal design, There were no objections to the proposed alignment, <br /> <br />At the January 9, 1997 meeting, the town approved the proposed channel work and the new alignment and <br />want to pursue State funding for the project through reapplication to the Department of Local Affairs, <br /> <br />COST ESTIMATE <br /> <br />The proposed channel is separated into six reaches as shown in Figure I, with approximate distances and <br />cost estimates for construction shown in Table 1, The estimate for engineering design and construction <br />observation fees are included in the table, <br /> <br />TABLE 1 <br /> <br /> COST ESTIMATE <br /> SW DRAINAGEW A Y, RAILROAD TO WASHINGTON STREET <br />REACH LENGTH (Feet) FROM - TO COST <br />1 1,155 Railroad culverts to east of SpruceNine $0 <br />2 315 East of SpruceNine to the intersection $11,000 <br />3 20 SpruceNine Street intersection (include utilities) $10,000 <br />4 190 SpruceNine intersection to alley west of Vine $56,000 <br />5 300 Alley at Spruce to Washington Street $3,000 <br />6 100 Washington Street crossing $55,000 <br />Total Construction Cost Estimate $135,000 <br /> Design Engineering Fee Estimate $13,000 <br /> Construction Observation Fee Estimate $8,000 <br />TOTAL ESTIMATED PROJECT COST $156,000 <br /> <br />The cost estimates assume concrete will be used for the work on Spruce Street and the crossing on <br />Washington Street, Less concrete, or a combination of concrete and asphalt, may be utilized to reduce the <br />construction cost estimate, <br /> <br />96-{)46,OO2IPRELIM <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.