Laserfiche WebLink
<br />The revised hydraulic analysis of Boxelder Creek was taken from a 1983 U.S. Department <br />of Agriculture, Soil Conservation Service (SCS) Floodplain Management Study (Reference <br />43) using hydrology developed by Simons, Li, and Associates (Reference 44). <br /> <br />There were no previously printed Flood Insurance Studies for the Towns of Berthoud, <br />Johnstown, and Timnath. <br /> <br />1.3 Coordination <br /> <br />Town of Estes Park <br />For the original FIS, the community base map was selected and streams requiring detailed <br />study were identified in meetings attended by personnel of the study contractor, FEMA, <br />Colorado Water Conservation Board (CWCB), Larimer County, and Town of Estes Park in <br />March and April 1976. <br /> <br />The results of the study were reviewed at a final coordination meeting in September 1977. <br />No significant problems affecting the study were identified. <br /> <br />Streams requiring revision were identified at a meeting attended by representatives of the <br />study contractor, FEMA, and Town of Estes Park in April 1983. <br /> <br />Results of the hydrologic analyses were coordinated with the CWCB, local consultants, <br />and U.S. Geological Survey (USGS). <br /> <br />The results of the study were reviewed at the final meeting attended by representatives of <br />the study contractor, FEMA, and the Town of Estes Park. <br /> <br />City of Fort Collins <br />For the original AS, community base map selection and the identification of streams <br />requiring detailed study were done at a meeting attended by Gingery Associates, Inc.; <br />FEMA; the Larimer County Planning Department; and officials of the City on April 20. <br />1976. The USACE, Omaha District, was also contacted during the course of the original <br />study. <br /> <br />During the course of the work done by Gingery Associates, Inc., flood elevations and <br />boundaries and floodway delineations were reviewed with community officials. Revisions <br />to the original study, completed in 1973, incorporated new data prepared for the City by <br />the original study contractor. <br /> <br />The initial Consultation and Coordination Officer (CCO) meeting was held on July 25, <br />1988, and attended by representatives ofFEMA; Gingery Associates, Inc.; and the City. <br /> <br />For the Cache La Poudre River restudy upstream of Horsetooth Road, coordination <br />meetings were held on November 26, 1991, and March 13 and April 28, 1992, with <br />representatives from Larimer County; the City of Fort Collins; SLA; the Colorado Water <br />Conservation Board (CWCB); and FEMA. <br /> <br />5 <br />