Laserfiche WebLink
<br /> <br /> Colorado Water Conservation Board <br /> Project Expenditure Schedule <br /> Monument Dam Rehabilitation Project <br />Sponsor: Town of Monument Loan Contract No.: C150062 <br />Address: P.O. Box 325 Authorization: $2,081,000.00 $362,000.00 <br /> Monument, CO 80132 Interest: 5.50% 5.50% <br />Contact: Rick Sonnenberg, Town Manager Term: 30 <br />Telephone: 719-481-2954 Conditions: Up to 67.5% <br />Fax: 719-481-1604 Tax 1.0. No.: 84-6007781 <br /> Substantial <br />E-mail: Completion Date: 8/1/2003 <br /> Balance <br />Loan Amount Cumulative Available to Accrued <br />Disb. No. Date Description Disbursed Loan Balance Loan Interest Interest <br /> $2,443,000.00 <br />1 6/3/2002 DesiQn and Construction $ 565,504.53 $ 565,504.53 $ 1,877,495.47 $ 36,130.32 $ 36,130.32 <br />2 6/28/2002 DesiQn and Construction $ 478,629.32 $ 1,044,133.85 $ 1,398,866.15 $ 28,776.77 $ 64,907.09 <br />3 8/5/2002 Desion and Construction $ 463,507.05 $ 1,507,640.90 $ 935,359.10 $ 25,213.51 $ 90,120.60 <br />4 9/5/2002 DesiQn and Construction $ 260,010.63 $ 1,767,651.53 $ 675,348.47 $ 12,929.30 $ 103,049.89 <br />5 9/16/2002 Design and Construction $ 165,899.30 $ 1,933,550.83 $ 509,449.17 $ 7,974.53 $ 111,024.42 <br />6 9/30/2002 Design and Construction $ 30,951.23 $ 1,964,502.06 $ 478,497.94 $ 1,422.48 $ 112,446.91 <br />