Laserfiche WebLink
<br />A final ceo meeting was held on July 12, 1983, and was attended by representatives of <br />FEMA, the study contractor, and the city~ All problems raised at that meeting have been <br />resolved in the study. <br /> <br />Jefferson County (Unincorporated Areas) <br /> <br />Streams requiring detailed and approximate study were identified at a meeting attended by <br />representatives of the study contractor, FEMA, Jefferson County, the UDFCD and the CWCB <br />on July 29, 1981. <br /> <br />Assistance in obtaining data was provided by the UDFCD and Jefferson County. Additional <br />funding was provided by the UDFCD to update selected reaches of their previous floodplain <br />studies for incorporation in the FIS. Additional assistance in the form of field surveys was <br />provided by the county. <br /> <br />The final ceo meeting for the original study was held on February 6, 1985, and was attended <br />by representatives ofFEMA, the study contractor, and the county. No problems were raised <br />at the meeting. <br /> <br />Town of Morrison <br /> <br />Contacts were made with, and information was requested from, the Town of Morrison; the <br />USACE, Omaha District; the Colorado State Archives; and other State and Federal agencies. <br />Liaison was maintained with the CWCB and the UDFCD (which includes Denver and the <br />urban portions of Jefferson County and other surrounding counties) to obtain information on <br />state floodplain regulations and to ensure coordination of work efforts. <br /> <br />City of Westminster <br /> <br />An initial ceo meeting was held by the City of Westminster on April 25, 1983. This <br />meeting, attended by representatives of the City of Westminster, CWCB, UDFCD and the <br />study contractor, was held to discuss the nature and purpose of the study and the scope and <br />limits of work. <br /> <br />The following agencies and individuals were contacted and supplied information used in the <br />preparation of this study: <br /> <br />City of Westminster Engineering Department <br />Colorado Highway Department <br />Natural Resources Conservation Service (NRCS) <br />(formerly known as Soil Conservation Service) <br /> <br />On January 5, 1987, the results of the original FIS were reviewed at a final coordination <br />meeting attended by representatives of the City of Westminster, UDFCD, FEMA, and the <br />study contractor. <br /> <br />4 <br />