My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10474
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:40:37 PM
Creation date
5/18/2007 9:17:18 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
594
County
Jefferson
Community
Jefferson County and Incorporated Areas
Title
FIS - Jefferson County and Incorporated Areas - Vol 1
Date
6/17/2003
Prepared For
Jefferson County
Prepared By
FEMA
Floodplain - Doc Type
Current FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The study for the City of Westminster was revised (Reference 16) to incorporate the effects of <br />new hydraulic analysis for a portion of Big Dry Creek (Reference 17). The results of a <br />previously issued LOMR were also incorporated for Walnut Creek (March 15, 1994). <br /> <br />The original study for the City of Wheat Ridge was prepared for FIA by the USACE, Omaha <br />District, under Interagency Agreement No. IAA -4-8-71 (Reference 18). The study covered all <br />suspected flood hazards within the City of Wheat Ridge (Reference 19). <br /> <br />1.3 Coordination <br /> <br />The following Consultation Coordination Officer (CeO) meetings were held to review and <br />supplement the results of original and revised studies. <br /> <br />City of Arvada <br /> <br />On April 25, 1983, an initial CCO meeting was held with representatives ofFEMA, the City <br />of Arvada, the Urban Drainage and Flood Control District (UDFCD), the Colorado Water <br />Conservation Board (CWCB), and the study contractor. Coordination with City officials and <br />Federal, State, and Regional agencies produced a variety of information pertaining to <br />floodplain regulations, flood history, and other hydraulic and hydrologic data. Because a <br />number of unexpected problems occurred with the contract and preparation of the study, a <br />lengthy delay resulted and a "restart" meeting was held with the ceo and the City of Arvada <br />on February 23, 1987. This meeting was held in order to get the project back on track and to <br />revise the stream study limits and the level of study detail to be performed. <br /> <br />The City of Arvada, UDFCD, and the FEMA Region vm office were contacted and supplied <br />information used in the preparation of the study. <br /> <br />On January 29, 1991, the results of the study were reviewed and accepted at a final ceo <br />meeting attended by representatives of the community, FEMA and the study contractor. The <br />study was acceptable to the community. <br /> <br />City of Edgewater <br /> <br />On September 22, 1988, the results of the study were reviewed and accepted at a final ceo <br />meeting attended by representatives of the community and FEMA. <br /> <br />City of Golden <br /> <br />Information was obtained from the City of Golden; the UDFCD; the State Engineers Offices; <br />the U.S. Geological Survey (USGS); the USACE, Omaha District; and several other State and <br />Federal agencies. <br /> <br />Liaison was maintained with officials from the CWCB, UDFCD, and Jefferson County. As a <br />result of communication with these agencies, information was exchanged, hydrologic methods <br />were established, and a general coordination of work efforts in the area was achieved. <br /> <br />An initial ceo meeting was held in Golden on Aprill, 1976, between FEMA and <br />community officials to discuss the purpose and scope of the FIS. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.