Laserfiche WebLink
<br />7. Project Time Schedule <br /> <br />34 <br /> <br />8. Summary <br /> <br />36 <br /> <br />TABLES <br /> <br />Table <br />3.1 Instrumentation options for the design phase <br />3.2 Project design and equipment costs <br />4.1 Project time line and 10-yr benefit/cost <br />4.2 Project fust year operational costs <br />4.3 Estimates of cloud treatment additional water <br />7.1 Time Line for the Program Design Phase <br /> <br />Page <br />11 <br />16 <br />22 <br />24 <br />27 <br />34 <br /> <br />FIGURES <br /> <br />Figure <br /> <br />1.1 Map of the Headwaters Region of the North Platte River Basin <br />2.1 Conceptual model of orographic cloud with SL W zone and AgI seeding plume <br />4.1 Sample seeding device placement in the Headwaters Region for 240 degree winds <br /> <br />APPENDIXES <br /> <br />Appendix A <br /> <br />IV <br /> <br />~ <br /> <br />If <br /> <br />Page <br /> <br />3 <br />6 <br />25 <br />