My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00272
CWCB
>
Weather Modification
>
Backfile
>
WMOD00272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:29:16 PM
Creation date
5/16/2007 3:02:42 PM
Metadata
Fields
Template:
Weather Modification
Title
The Feasibility of Operational Cloud Seeding in the North Platte River Basin Headwaters to Increase Mountain Snowfall
Prepared For
US Department of the Interior Bureau of Reclaimation
Prepared By
Jonnie G. Medina, Technical Service Center, Water Resources Services
Date
5/1/2000
County
Statewide
State
CO
Weather Modification - Doc Type
Scientific Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />CONTENTS <br /> <br />Page <br /> <br />Executive Summary v <br /> <br />1. Introduction 1 <br />1.1 General Discussion 1 <br />1.2 Program General Plan 2 <br /> <br />2. Scientific Basis 5 <br />2.1 Previous Studies 5 <br />2.2 Cloud Seeding Basics 6 <br /> <br />3. Program Design Phase 8 <br />3.1 Background 8 <br />3.2 Design Phase Components 9 <br />3.3 Cloud Modeling Studies 9 <br />3.4 Cloud Seeding Hypotheses 10 <br />3.5 Field Instrumentation 11 <br />3.6 Field Studies 12 <br />3.7 Cloud Seeding Operations 13 <br />3.8 Design Phase Costs 14 <br />3.9 Field Equipment Costs 18 <br />3.10 Seeding Suspension Criteria 18 <br />3.11 Extended Area Effects 18 <br /> <br />4. Operational Cloud Seeding Phase 20 <br />4.1 General Features 20 <br />4.2 Operational Seeding Program Components 20 <br />4.3 Seeding Operations and Data Collection 21 <br />4.4 Estimation of Operational Seeding Costs 21 <br />4.5 Estimate of Operational Seeding Benefits 21 <br />4.5.1 Cloud seedability parameter estimated from model simulations 29 <br /> <br />5. Compliance with Environmental Regulation 30 <br /> <br />6. Program Organization and Management 32 <br /> <br />111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.