Laserfiche WebLink
<br />Appendices <br />Appendix A - EFI Package Pump Station Details <br />Appendix B - Montezuma Water Company Standard Specifications <br /> <br />Exhibits <br />Exhibit 1 - Proposed Water Line Locations <br /> <br />List of Figures <br />Figure II-I: Project Location <br />Figure 11-2: Service Area Map <br />Figure 11-3: Proj ected Population of Goodman Point Over the Life of the Proposed Proj ect <br />Figure IV -1: Estimated Growth in Population of Goodman Point over the Lifetime of the <br />Proposed Proj ect <br />Figure IV-2: Estimated Population Growth and Associated Water Demand for Goodman Point <br />Figure V-I: Proposed Action <br />Figure V-2: Alternative Sites <br />Figure VII-I: Water Storage Tank and Booster Pumps <br /> <br />List of Tables <br />Table 11-1: Legal Descriptions <br />Table 11-2: Projected Growth Rates for Montezuma County and Estimated Goodman Point <br />Population Based on County Growth Rate <br />Table V-I: Constmction Cost Comparison <br />Table V-2: Non-Constmction Cost Comparison <br />Table VI-I: Twenty Year Present Worth Cost Analysis for Alternatives 2 and 3 at an Interest <br />Rate of 3% <br />Table VII-I: Water Storage Tank Design Criteria <br />Table VII-2: Booster Pump Station Design Criteria <br />Table VII-3: Opinion of Cost <br />Table VII-4: MWC Monthly Rates for Outlying Areas <br />Table VII-5: Estimate of Short-lived Asset Reserve Requirements <br /> <br />Goodman Point Water Association - Preliminary Engineering RepOli <br /> <br />III <br />