My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - Goodman Point Pipeline Environmental Assessment_Final Env & Eng Report
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Southwest - Goodman Point Pipeline Environmental Assessment_Final Env & Eng Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2012 12:23:15 PM
Creation date
5/16/2007 8:51:26 AM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Southwest
Applicant
Goodman Point Water Association
Description
Goodman Point Water Association Environmental Report - Preliminary Engineering Report
Account Source
Basin
Board Meeting Date
3/13/2007
Contract/PO #
08000000075
WSRF - Doc Type
Final Deliverable Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />water storage tanks. The elevated tank requires more design work than the ground level <br />tank. <br /> <br />Land acquisition, legal, and permitting costs will differ for the two alternatives. The <br />acquisition of additional property will be required if the water storage tank and the <br />booster pump station are not located on the same property. Permitting costs will differ as <br />Alternative 3 requires more constmction in the County ROW than Alternative 2. Table <br />V -2 below presents a summary of anticipated non-constmction costs for each alternative. <br /> <br />T bl V 2 N C t f C t C <br /> <br />a e - : on- ons ruc .on os ompanson <br />Item Cost <br /> Alternative 2 Alternative 3 <br />Engineering $142,4 70 $163,420 <br />Interim Financing $17,809 $20,428 <br />Land Acquisition $10,000 $20,000 <br />Legal $5,000 $7,500 <br />Permitting $9,000 $9,250 <br />Total $184,279 $220,598 <br /> <br />Engineering costs are estimated based on 8% of the total constmction costs, while interim <br />financing costs are estimated at 1 % of the total estimated loan amount. Alternative 3 has <br />higher engineering and interim financing costs due to a higher constmction cost estimate. <br /> <br />Land acquisition costs are based on the purchase of an approximately 100 square foot <br />parcel for Alternative 2, and two (2) 100 square foot parcels for Alternative 3. Legal <br />costs are for the preparation of deeds for the parcels described above, as well as <br />preparation of easements. <br /> <br />Permitting costs include county permits for boring at $1500 per bore, and approximately <br />six required bores for both alternatives. Alternative 3 also includes additional county <br />permitting costs for constmction work within the right of way for the County Road M <br />route. <br /> <br />3. Annual Operations and Maintenance <br />Annual operations and maintenance will be slightly higher for Alternative 3 than for <br />Alternative 2. This is because the pumps for Alternative 3 are required to pump to a <br />higher elevation. However, maintenance of the pumps and the distribution system, <br />sample collection, and reading service meters will be required of both alternatives and <br />will have similar costs. <br /> <br />The pump motors require three-phase power to nm; however, three-phase power is not <br />available in the project area. A VFD may be used to convert single phase power to three <br />phase power with some loss in power. Approximately 1.6 times the power is required to <br />convert the power to three-phase through the VFD. This power consumption increase is <br />reflected in estimated power costs. Power costs in the area are $0.0919 per kilowatt hour. <br />Estimated annual power costs for Alternative 2 are $4,320 to operate one 5-hp pump 24- <br /> <br />Goodman Point Water Association - Preliminaty Engineering RepOli <br /> <br />15 <br />