<br />G. Cost Estimates <br /> <br />1. Construction Costs <br />Constmction costs for each alternative can be broken down into several project <br />components including the water main route, water storage tank constmction, and the <br />booster pump station constmction. These costs include constmction of the project <br />component and equipment costs. Not included in the constmction cost estimate is <br />permitting, land acquisition, legal, and administrative costs. Constmction cost estimates <br />for Alternates 2 and 3 are provided below in Table V-I. <br /> <br />Project Component <br />Water Main <br />Water Storage Tank <br />Booster Pump Station <br />Contingency - 15% <br />Total <br /> <br />Table V-I: Construction Cost Comparison <br /> <br />Cost <br />Alternative 2 Alternative 3 <br />$1,309,775 $1,309,775 <br />$64,278 $271,021 <br />$178,525 $193,525 <br />$232,287 $264,948 <br />$1,785,465 $2,040,469 <br /> <br />Constmction costs for the water ma1l1 are equivalent for either Alternative because <br />approximate length is equal. <br /> <br />Water storage tank costs are greater for Alternative 3 because the tank in this alternative is <br />an elevated tank in order to serve the distribution system by gravity. Elevated tanks are <br />significantly more costly to constmct than ground level tanks. <br /> <br />The booster pump station has higher constmction costs for Alternative 3 than for <br />Alternative 2 because the pump station will be pumping to the water storage tank as <br />opposed to pressurizing the system. This increases the required head the pumps must <br />deliver due to the height of the tank. Therefore each pump will be powered by a 7.5-hp <br />motor as opposed to a 5-hp motor. Although backup power is not required for this <br />alternative, which reduces costs, the additional site work required for having the tank and <br />pumps at different locations increases constmction costs for Alternative 3. <br /> <br />2. Non-Construction Costs <br />Non-constmction costs that may be associated with the proposed project or alternative <br />include the following: <br />.,/ Engineering <br />.,/ Interim Financing <br />.,/ Legal <br />.,/ Land Acquisition <br />.,/ Permitting <br /> <br />Engineering costs and interim financing costs are estimated to be slightly lower for <br />Alternative 2 than for Alternative 3. This is primarily because of the difference in the <br /> <br />Goodman Point Water Association - Preliminaty Engineering RepOli <br /> <br />14 <br />