Laserfiche WebLink
<br /> <br />Start <br />date <br /> <br />Table 6.4.--Glen Canyon Darn routing results for San Juan storm <br />. followed by the Boulder storm <br /> <br />Lag <br />(days) <br /> <br />Maximum <br />inflow <br />(ft 3/ s) <br /> <br />60-day <br />volume <br />(10' ac-ft) <br /> <br />Maximum <br />outflow <br />(ft3/S) <br /> <br />Starting <br />reservoir <br />elev (ft) <br /> <br />Maximum <br />reservoir <br />elev (ft) <br /> <br /> <br /> <br /> <br />75 <br /> <br /> <br /> <br />