Laserfiche WebLink
<br /> <br />63 <br /> <br /> <br />Table 5.3.--Monthly 1985-level depleted base snowmelt flood for <br />Glen Canyon Dam <br /> <br /> 100-year 1985-level 1985-level <br /> snowmelt flood depletion depleted flow <br />Month (acre:"'feet) (acre-feet) (acre-feet) <br />January 691,400 108,400 583,000 <br />February 581,100 72,300 508,800 <br />March 978,200 108,500 869,700 <br />April 1,959,200 253,100 1,706,100 <br />May 7,259,500 397,700 6,861,800 <br />June 6,516,100 578,400 5,937,700 <br />July 3,594,400 723,000 2,871,400 <br />August 1,513,200 650,700 862,500 <br />September 910,800 361,500 549,300 <br />October 456,700 144,600 312,100 <br />November 408,400 108,400 300,000 <br />December 506,000 108,500 397,500 <br />Total 25,375,000 3,615,100 21,759,900 <br /> <br />5.4 DAILY DEPLETIONS FOR GLEN CANYON DAM <br /> <br />The 100-year base snowmelt flood hydrograph consists of daily <br />values. Therefore, accompanying 1985-level daily depletions were <br />needed to determine the daily 100-year depleted base snowmelt flood <br />for Glen Canyon. The computer program GENHS was developed to <br />produce a balanced hydrograph from known volumes and their <br />associated time periods (e.g., 1-, 5-, 10-, 15-, 20-, 30~, 60-, <br />90-days, etc.). The monthly depletion data were plotted to show the <br />basic hydrograph shape. These monthly volumes were used as input to <br />the program, GENHS, to generate a daily hydrograph of depletions. <br />The resulting hydrograph was adjusted manually to equalize the <br />beginning (January) and ending (December) daily depletions and to <br />smooth the data. The daily depletions were subtracted from the <br />100-year base snowmelt flood hydrograph to establish the depleted <br />flow conditions. The resulting depleted daily flows and monthly <br />volumes are presented in table 5.4. The 1985-1evel depleted <br />100-year base snowmelt flood annual volume is 21,759,600 acre-feet. <br />Monthly volumes, computed from the daily data, are slightly <br />different from those computed from the monthly data because of the <br />hydrograph shaping and smoothing process. <br />