Laserfiche WebLink
<br />rehab,H.itations. As, such. 'w:eunderstan,d their system and have developed a 'measure of trust with <br />their staff+ <br /> <br />Task A7nO~ Engineer1s Construction Cos.f:'Estimate: <br /> <br />The final report w-:ill in.elude ,an opinion of the total.project costs for idesign and construction :of <br />the water reservoir and associat.ed. faci.Hties" The total p,roject costs 'will, as amin.imum, include <br />th,e fo.llo,wing:: <br /> <br />· 'Capital costs <br />Engineering services including d,esign" b1i.dding, an.d ,constrllctj,on, manag;em,ent <br />Construction includin,g aU labor and :m.aterIals ' <br />· A,dministrati'vel' permitting', and legal costs <br />· Prep.are a proposed project implementation schedule that covers activ'ities from <br />completion o,ffm311 ,design1 bidding, cOinstru,cti.on and initial fi,Uing of the reservoir <br /> <br />Tasl;. A80~1: Bid Process': <br /> <br />The engin.eer 'wiU, prov'ide supp!ort during the negotiation process by developin.g the construction <br />contract d'ocuments. The C10ntract docwnents will contain the information req'uired fo,r the <br />prospective, bidders to, evaluate the project oompDnentsand develo.p costs to com.plete the work <br />an-d enter into a con-struction a,greement. C,opies of'fue drawings: an,d. specific.atilQ,Qs wiil <br />acca,mpany the ,contract documents. The contract documents will consist of the following: <br /> <br />II <br /> <br />Instructions for Bidder <br />Contract a gre.e:m ent <br />General terms and conditio.ns <br />Special conditions <br />Form ofpropdsa[ <br /> <br />. <br /> <br />:i1 <br /> <br />.1 <br /> <br />.. <br /> <br />The engineer will provide technical Dssistanc!e during negotiatlo,n of the' co'ntract~ hi 8,ddinon, the <br />engule.er will provide. te.chnical infonn.ati,on regarding the b,],d documents, co'o;duct a pre~bid <br />meeting at Q'[char'd. City's ,office'.1 and prepiare: tec:tlmical ,!ette.rs of clarification.. <br /> <br />Staffing <br /> <br />Smith Wl1U.ams has the necessary in~house techn1caI!sup,port staffan.d .r-es'ources a,vlailable to <br />c,omp]ete the- oo.oceptual design stUdy~ OU!' proposed staff to complete the engineering services <br />includes th.e following: <br /> <br />I ~ R. Mt:Cha'eJ Smith, P',E.wiH be the Princip.in-Chargt! ,on the project. With ove'r <br />28 years of progressive experi.e,nce~~fike will man.ag:e th.e :engin.eering services and, <br />prov,ide technical s,upport for the proJect. Mike will also be available. to' provi.de <br /> <br />9 <br />