<br />Th.e drawings ,and s,pecifica:tions will be comp],eted in accordan,ce 'with the S'EO guidelines,~ Th.e
<br />package wwl1 ;aUow IOre.hard C'ity, the, opportunity to revriew the co-nstruct],on documents prior to
<br />submittal to the SEO, bi,dding: and oonst:ruction~
<br />
<br />R.e:vlew COnnD.en.'tg r-elatedto Ihe draft final,des.ign. will be incorporated into ,8 '[mal design, :report.
<br />Engineer wi~l submit five (5) copies ofth.e fmal design repo'.ft~ In addition'J the En,gineer wi! I
<br />pr=Dvide:an electronic version of the repo.rt M.d associated docwnents on a compact disc (CD) in
<br />pdf ftnmat that iscompatibJe v~dth Orchard ;C]ty~s co,mputer :system~
<br />
<br />Task A60'O:: Dam Sa,ref)" ,ApplicaJioD
<br />
<br />E'og:ineer willI ,assis,t Orchard City in obtaining appr,ov.al to construct the D,arn from the Colorado
<br />S'tate' Engineer"s Q:ffice (SE'O),.... As required, the: Engineer will. contact the SED" .prepare tbe
<br />do,cuments for Orchard City review and ,obtain, Olr.chard Cily~sapproval for the S-EOapplication,
<br />to 'constru'c~, a d,am.. The engin.eer willI. address any questions regarding the application with the
<br />SEO Wld make tIle necessary revisions.. The requi~ed d'ocume'nts fOlctbe SEO, ap.proYal to,
<br />oonstruct a new dam include: the following:
<br />
<br />.l Application Fonn
<br />:.1 D,esign ,Drawings
<br />· Specifications
<br />· ,Design report cons:isting' of
<br />Hy'dr,ology ~port
<br />Gelotecbnical repo,rt
<br />Instn.lmentati.on Plan
<br />Eng:weer' 5 cost estimate
<br />'. Filing fee
<br />
<br />F.ol'lovving approval for COItStructiOD; put prio,t to flna'~ inspection of the D'anljl the fo!lJ.owiog
<br />docum.en.tsneed to be pr'epar,edan,d, submitted to 'the SEO for 8:p,proval befor'e initial filling' of
<br />'the reservoir may begin: ~
<br />
<br />.. :C.onstru.ction Report
<br />.1 In:iti al F'j ~ ~ing Plan
<br />· Lo:ng-te'nn mo'rutonng plan
<br />· Em,ergen.cy Prep,aredn,ess, Plan
<br />
<br />Supp,orting, i.nformati.on for'th'e information listed abo,veconsists o.f'but is :n1ot limitied. to, dam
<br />failure inund,atio.n m,aps .and, ,an In,strumentation M"on.itoringand Repo1rtingPlani Thes.e items are
<br />n.ot include)d in, th.e Final Design Scope ofW'o[k~
<br />
<br />It should beo,oted that members Q.four te,am have favorable re]ation,ships with, th,e SEO .W1d ha:ve
<br />worked with m'ost of the c'urre.nt S.EO staffo.n a number o'frecent. dam de.signs and
<br />
<br />8
<br />
|