Laserfiche WebLink
<br />000734 <br /> <br />received from the State for purposes of this study. The Ground Rules specified using the C1 Data Set <br />set in the condition received from CWCB.Consequently all of the analysis completed for the <br />Technical Memoranda used the C1 Data Set data set in which this operational rule remained turned <br />off. <br /> <br />The necessary operational rule to model the Orchard Mesa Check Case Settlement was turned on in <br />the C1 Data Set Fourth Revision (see Table 2 and Appendix M). <br /> <br />2.3.15 Comparison of Runs <br /> <br />The difficulty of comparing the output from several model runs on a side~by-side basis was overcome <br />by the design and implementation of several Excel spreadsheets. These spreadsheets allowed a <br />detailed comparison of any two runs through the use of pull-down menus to facilitate selection of any <br />storage reservoir, water diversion, or operational rule desired. In addition the spreadsheets permitted <br />the user to view both raw data and graphs of any parameter computed by StateMod, including, but not <br />limited to, end-of-month (EOM) storage, total release, diversions by priority, shortages and individual <br />accounts. These spreadsheets with all of the modeled results are included in Appendix O. <br /> <br />2.3.16 Procedures to Estimate Outlet Works Capacities <br /> <br />It was necessary to estimate the available release capacity for CFOPS releases in order to ensure that <br />the StateMod runs did not assume infinite release capacity available for CROP, CFOPS and normal <br />operating releases. Available release capacities were estimated using the following procedures. <br /> <br />II <br /> <br />. <br /> <br />Monthly releases for W oHord Mountain Reservoir, Williams Fork Reservoir, Granby <br />Reservoir and Green Mountain Reservoir were obtained from the C1 Data Set Fourth <br />Revision. Maximum release capacities from these reservoirs were obtained from the <br />Colorado River Water Conservation District for W oHord Mountain Reservoir, from <br />Denver Water for Williams Fork Reservoir and from the u.S. Bureau of Reclamation <br />for Green Mountain Reservoir and Granby Reservoir. The estimated CROP releases <br />are presented in Table 3. <br /> <br />Available release capacity was estimated by: <br /> <br />A vailable Release Capacity = Max. Release Cap. . Cl Data Set Fourth Revision Release - <br />estimated CR OP Bypass. <br /> <br />The principal limiting factor for releases from Ruedi Reservoir is downstream channel <br />capacity. Maximum channel capacity on the Frying Pan River near Basalt is 1,100 cfs <br />(see Technical Memorandum No.5). For Ruedi Reservoir, available release capacity <br />was estimated by: <br /> <br />A vailable Release Capacity = Max. Channel Cap. - Cl Data Set Fourth Revision Release - <br />estimated CR OP Bypass. <br /> <br />. <br /> <br />. <br /> <br />27 <br /> <br />P:\Data \GEN\CWCB\19665\Repon Phase 2\FinalRepon12002\Final_ Draft j~.epon(l-03),doc <br />