Laserfiche WebLink
<br />(;0071.7 <br /> <br />Dan Luecke's Comments <br /> <br />Randy -- I've read the draft of the Final Phase 2 CFOPS Report. The message in this draft is <br />loud and clear -- there are a host of options for supply 20,000 acre-feet to enhance the peak in the <br />IS-Mile Reach except in dry years. I support the concept and think that the Modified "Share the <br />Pain" alternative is the most sensible. In fact, I would also be willing to consider most other <br />feasible options as possibilities, with the exception of the Webster Hill reservoir. I think I would <br />choke on this one as would most of the environmental community. <br /> <br />E <br /> <br />P: \Data \GEN\CWCB\19665\Repon Phase 2\ Technical Memorandum No, 12\Appendix B.doc <br /> <br />25 <br />