My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - Goodman Point Pipeline Environmental Assessment_Application Addendum
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Southwest - Goodman Point Pipeline Environmental Assessment_Application Addendum
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2012 12:19:38 PM
Creation date
4/18/2007 3:32:33 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Southwest
Applicant
Goodman Point Water Association
Description
Goodman Point Water Association Environmental Report - Preliminary Engineering Report
Account Source
Basin
Board Meeting Date
3/13/2007
Contract/PO #
08000000075
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Goodman Point Water Association <br />J.R. Berry, President <br />Keri Mustoe, Vice-President <br />Rodney Evans, Secretary-Treasurer <br />"12190 Road 16 <br />Cortez, Colorado 81321 <br />Phone: (970) 759-9562 <br />Email: JR.Berry~Hotmail.com <br /> <br />March 30, 2007 <br /> <br />Mr. Rick Brown <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 802 <br /> <br />Mr. Brown, <br /> <br />This letter is in response to your communication of M'arch 6th to Goodman Point <br />Water Association. In this communication you requested additional information <br />regarding our grant request in the amount of $7,700 to help fund an Environmental <br />Report and Preliminary Engineering Report. <br /> <br />I trust you will find the GPW A response sufficient to clarify the issues in question. <br />Please regard this letter as an Addendum to our original grant request. <br /> <br />Issues/Additional Needs: <br /> <br />1. Staff did not receive attachments. Per Rick Brown's subsequent email to me, it was <br />verified that the attachments had been received from Steve Harris subsequent to <br />electronic submission of the grant application by Steve Harris on January 11th, 2007. <br /> <br />2. Please describe how this project fits conceptually into the entire process of <br />constructin,g the pipeline (i.e.., key major steps and challenges). This project is to develop <br />the Prelimillary Engineering Report and the Environmental Report. ,These reports are <br />necessary to qualify for fUll ding (grants & loans from the USDA-RD and possibly <br />other State, Federal and Private funding sources. We anticipate a major portion of the <br />construction funding will come from USDA-Rural Development. Once these reports <br />are complete and accepted by RD, GPWA can begin grant applications for construction <br />of the project. In short, these reports are the second step in the process of extending <br />Montezuma Water Companies water lines into the Goodman Point area. (The first step <br />was formation of the non-profit "Goodman Point Water Association" in August of <br />2006.) As regards the development of the ER and PER we don't anticipate "key major <br />steps and challenges". <br />
The URL can be used to link to this page
Your browser does not support the video tag.