Laserfiche WebLink
<br />9J\JC <br /> <br />SMITH WILLIAMS CONSULTANTS, INC. <br /> <br />December 18.2006 <br />Proposal P06-078 <br /> <br />Orchard City Reservoir Proposal for Engineering Services <br /> <br />continuity and will interface with Orchard City in meetings, project tracking, and <br />reporting purposes. <br /> <br />2. Derek T. Wittwer, P.E., will be the Project Manager on the project. With over 13 <br />years of professional experience primarily related to the mining industry. His <br />experience related to water resources projects is diverse and includes several large <br />projects globally. His most recent work includes being the project man~ger <br />responsible for the feasibility designs on dams in the Philippines and in Nevada. <br /> <br />3. Troy Thompson. P.E. is a registered Senior Civil Engineer with over 15 years of <br />professional experience primarily related to water resources in Colorado. He will act <br />as the Senior Hydrologist on the project. He is well known and respected by the <br />state of Colorado and has significant experience in the water resources industry in the <br />areas of hydrology and hydraulic design. <br /> <br />4. Jay N. Moore, P.E., is a registered Project Civil Engineer with more than seven <br />years of design experience. He will be the Project Engineer and will assist with the <br />design of the project. Jay has excellent experience with AutoDesk Land <br />Development and AutoCAD, which would be the.two principal design aids used for <br />preparing the detailed design drawings. <br /> <br />5. Other technical support staff, including additional engineering support staft: <br />AutoCAD technicians, and administrative staff, will be assigned to the project as <br />necessary to complete the work. <br /> <br />Estimated Costs for Services <br /> <br />Smith Williams has prepared a cost breakdoWn for each of the tasks described in the Scope of <br />Work section. A summary of the estimated costs for the project is shown in Table I. Estimated <br />costs for the individual work tasks are shown in Tables 2 through 9. The hours and rates shown <br />on the tables represent our estimate of the time for the designated staff that would be working on <br />the project and their corresponding hourly rate. During the course of the work, different staff <br />could work on the project and their rate could be slightly different from that shown on the tables; <br />however, Smith WilliamS will not exceed the budget presented without prior approval. Outside <br />contracted services and experises will be invoiced at cost plus a 10 percent fee. To the save this <br />surcharge the owner may elect to contact the services (Vehicle Rental, Drill rigs, surveyors, <br />excavation equipment, etc.) directly. Incidental cost to the project such as lodging and meals <br />will be billed on a per diem basis and/or a man-hour load (ODC's). The man-.hour is explained <br />below. <br /> <br />Our estimated costs for professional services are based on the following assumptions: <br /> <br />S:\PROPOSAlS\2006 PROPOSALS\PQ6.Q78 ~ ORCHARD CITY RESERVOIR\P06-078 -ORCHARD CITY RESERVOIR. DOC <br /> <br />9 <br />