Laserfiche WebLink
<br />Page 3 <br /> <br />COSTSIFUNDING <br />Estimated construction is six to ten million dollars pending final engineering. Funding sources, <br />include, but are not limited to, grants from State Round Table funds made available by Senate Bill 179, <br />grant funds from the Gunnison Basin Roundtable, grants from the Colorado River Conservation <br />District, grants and loans from the Colorado Water Conservation Board, loans and grants from the <br />USDA Rural Development, and cash and water rights reserves of the Town of Orchard City. These <br />funds are readily available upon completion of engineering and permitting. The grant being sought <br />will jump start this project. <br />