Laserfiche WebLink
<br />to cluster meetings with other worl(ing groups on the same day and in the same <br />location. <br /> <br />Fundin2 <br />Funding may come from a variety of sources. The source of funding has not yet been solidified. <br /> <br />Relevant Studies and Plans <br />The group identified some of the plans, studies, and other documents addressing Fountain Creel( <br />that are currently underway. These documents, in no particular order, include: <br />. Projects with Approximate Dates of Completion <br />o Environmental Protection Agency (EPA) Watershed Capacity Building Grant <br />Application <br />o E coli. Study (phase 1 complete 3/2007) <br />o Watershed Reach Analysis (3/2007) <br />o Army Corps of Engineers study <br />· Hydrology, hydraulics, and geomorphology (completed) <br />· Environmental assessment (completed) <br />· Formulation of alternatives and evaluation (12/2007, contingent on funds) <br />o 208 Plan (on point and non-point sources of pollutants in Fountain; 2008) <br />o Transit model- Fountain Utilities <br />o Army use buffer study <br />o Waste water management plan <br />o U.s. Geological Survey studies <br /> <br />. Completed Documents <br />o Fountain Creel( Watershed Plan <br />o Fountain Creel( Conflict Assessment <br />o Senator Salazar's vision <br />o Petros vision <br /> <br />. Ongoing Efforts <br />o Peal(s to Prairie Conservation Plan <br />o Front Range Trail <br /> <br />. Other plans and studies that might be relevant or instructive <br />o Cherry Creel( Watershed Plan <br />o Other watershed plans <br />o Pueblo reservoir plan <br />o Private engineering plans <br />o Community, city, county development plans <br />