My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - Round Mountain Water System Improvement Project_Full Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Arkansas - Round Mountain Water System Improvement Project_Full Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2013 4:41:57 PM
Creation date
4/17/2007 9:08:45 AM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Arkansas
Applicant
Round Mountain Water and Sanitation District
Description
Round Mountain Water and Sanitation District Water System Improvement Project
Account Source
Basin
Board Meeting Date
5/22/2007
Contract/PO #
150403
WSRF - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Supply Reserve Account - Grant Application Form <br /> <br />Form Revised October 2006 <br /> <br />4. Please provide a brief narrative of any related or relevant previous studies. Attach additional <br />sheets as needed. <br /> <br />An Evaluation of the Public Water System for the Towns of Silver Cliff and Westcliffe in cooperation with the <br />Round Mountain Water and Sanitation District, funded in part by a grant from the Department of Local Affairs, was <br />completed by the Crabtree Group, Inc. in November 2006. <br /> <br />RMWSD, Silver Cliff, Westcliffe and the Wet Mountain Fire Protection District each contributed matching funds to <br />complete this study. <br /> <br />The Study includes a Geographical (growth area) and Timeline Scope (current to 25 years in the future), planning <br />scope, technical scope and financial scope. <br /> <br />The Planning and Forecasting section includes demographic data and historical utility demand. <br /> <br />The Engineering Analysis includes existing water infrastructure, water system performance factors, water modeling <br />analysis, model results for suggested improvements, water storage analysis, water quality analysis, backflow <br />prevention, water tap policies and water rights. <br /> <br />The Study includes a section on Water Rates Structure including types of usage rate structures and rate structure <br />comparIsons. <br /> <br />Conservation Values and Policies and Conservation Programs are addressed and finally, Study Recommendations <br />are made including general recommendations and water infrastructure recommendations with costs of infrastructure <br />improvements as developed in the planning process. <br /> <br />RMWSD's water project was based on the recommendations of this study. Also, RMWSD has taken the study's <br />general recommendations under consideration and will be reviewing their existing policies to incorporate some of <br />the recommendations into future policies. <br /> <br />See Attachment C for excerpts from Study. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.