My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - Round Mountain Water System Improvement Project_Full Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Arkansas - Round Mountain Water System Improvement Project_Full Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2013 4:41:57 PM
Creation date
4/17/2007 9:08:45 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Arkansas
Applicant
Round Mountain Water and Sanitation District
Description
Round Mountain Water and Sanitation District Water System Improvement Project
Account Source
Basin
Board Meeting Date
5/22/2007
Contract/PO #
150403
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Supply Reserve Account - Grant Application Form <br /> <br />Form Revised October 2006 <br /> <br />4. Please provide a brief narrative of any related or relevant previous studies. Attach additional <br />sheets as needed. <br /> <br />An Evaluation of the Public Water System for the Towns of Silver Cliff and Westcliffe in cooperation with the <br />Round Mountain Water and Sanitation District, funded in part by a grant from the Department of Local Affairs, was <br />completed by the Crabtree Group, Inc. in November 2006. <br /> <br />RMWSD, Silver Cliff, Westcliffe and the Wet Mountain Fire Protection District each contributed matching funds to <br />complete this study. <br /> <br />The Study includes a Geographical (growth area) and Timeline Scope (current to 25 years in the future), planning <br />scope, technical scope and financial scope. <br /> <br />The Planning and Forecasting section includes demographic data and historical utility demand. <br /> <br />The Engineering Analysis includes existing water infrastructure, water system performance factors, water modeling <br />analysis, model results for suggested improvements, water storage analysis, water quality analysis, backflow <br />prevention, water tap policies and water rights. <br /> <br />The Study includes a section on Water Rates Structure including types of usage rate structures and rate structure <br />comparIsons. <br /> <br />Conservation Values and Policies and Conservation Programs are addressed and finally, Study Recommendations <br />are made including general recommendations and water infrastructure recommendations with costs of infrastructure <br />improvements as developed in the planning process. <br /> <br />RMWSD's water project was based on the recommendations of this study. Also, RMWSD has taken the study's <br />general recommendations under consideration and will be reviewing their existing policies to incorporate some of <br />the recommendations into future policies. <br /> <br />See Attachment C for excerpts from Study. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.