My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01877
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01877
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:48 AM
Creation date
4/9/2007 2:52:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150012
Contractor Name
Model Land and Irrigation Company, The
Contract Type
Loan
Water District
19
County
Las Animas
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORl\DO <br /> <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br /> <br />1 313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3581 <br />FAX: (303) 866-3589 <br /> <br />June 15, 1999 <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />hltp://w a ter .state .co. us/def au It. htm <br /> <br />Mr. Terrance Arnold, P.E. <br />Vice President and Principal In Charge <br />URS Greiner Woodward Clyde <br />Stanford Place 3, Suite 600 <br />4582 South Ulster St. <br />Denver, CO. 80237 <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Hal D. Simpson. P.E. <br />State Engi neer <br /> <br />When replying, please refer to: <br />Model Reservoir Coffer Dam <br />Construction File Number: None <br />Water Division 2, DAMID: None <br /> <br />SUBJECT: Approval of plans and specifications for construction <br /> <br />Dear Mr. Arnold: <br /> <br />Thank you for submitting for the review and approval of the State Engineer the plans and <br />specifications for the construction of the proposed Model Reservoir Coffer Dam near Trinidad, <br />CO. We have completed our review of the design and construction documents and have found <br />them to be acceptable for construction. The coffer dam and temporary outlet works will allow <br />surface diversions to be routed through the reservoir basin and existing outlet works to irrigated <br />lands below. It will, also, be used for protection during the planned future Model Dam outlet <br />works replacement and embankment repair. <br /> <br />We look forward to working with you on this construction project and to achieving the <br />successful future completion of the proposed modifications to Model Dam and appurtenant <br />structures. <br /> <br />Sincerely, <br /> <br />c-~~~ <br />~;~ ~yers, P~E. <br />Assistant State Engineer <br /> <br />Xc: <br /> <br />Dam Safety Central File <br />Steve Witte, Division Engineer <br />Mike Graber, Dam Safety Engineer (w/approved plans and specifications) <br />William Green, Water Conservation Board <br />Danny Marques, Water Commissioner <br />R.B. Jowell, President, Model Land and Irrigation Co <br />
The URL can be used to link to this page
Your browser does not support the video tag.