My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01877
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01877
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:48 AM
Creation date
4/9/2007 2:52:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150012
Contractor Name
Model Land and Irrigation Company, The
Contract Type
Loan
Water District
19
County
Las Animas
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />URS Greiner Woodward Clyde <br /> <br />.. <br /> <br />Mr. R.B. "Monk" lowell, President <br />Model Land & Irrigation Company <br />March 9, 2000 <br />Page 2 <br /> <br />Based on our discussion with Mr. Green, the steps for completing the emergency loan through the <br />CWCB are: <br /> <br />1. Provide a copy of the new Articles ofIncorporation. <br /> <br />2. Provide a concise description of the water rights that are being pledged as collateral, as well as <br />copies of the decrees. <br /> <br />3. Provide consent from the Purgatorie Water Conservancy District granting the security interest for <br />the collateral being pledged by the Model Land and Irrigation District to the CWCB. <br /> <br />4. Provide the Agreement letter from the Colorado State Engineer's Office for the required <br />measurement devices. <br /> <br />5. Submit the resolution approved by the company shareholders approving the increased annual <br />assessment and other required funds for the repair project. <br /> <br />6. Complete negotiation of the contract between the Model Land and Irrigation Company. <br /> <br />Mr. Green also stated that following submittal of all of the information noted above, funds would be <br />available for disbursement about two to three weeks after the contract is signed. <br /> <br />Sincerely, <br /> <br /> <br />TEA:lIw <br /> <br />(1 copy sent) <br /> <br />3c: Mr. Bill Green, CWCS <br />lc: Mr. Hank Harbaugh <br />Mr. Bob Trout <br />Mr. Tom Tefertiller <br />File <br /> <br />I\DEN6\PROJECTSIWPMASTERIPROJECTS\44333\LE24 doc 03/C)9/1l() 11:31 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.