My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01877
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01877
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:48 AM
Creation date
4/9/2007 2:52:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150012
Contractor Name
Model Land and Irrigation Company, The
Contract Type
Loan
Water District
19
County
Las Animas
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br /> <br />March 9,2000 <br /> <br />~ECE.\\JE.t) <br /> <br />V\~~ ,{.\ 1\\\\\\ <br />~a\ef <br />co\o{ad~oo aoal'd <br />cOl\sef'l3 <br /> <br />Stanford Place 3, Suite 1000 <br />4582 South Ulster Street <br />Denver, CO 80237 <br />Tel: 303.694.2710 <br />Fax: 303.694.3946 <br /> <br />Offices Worldwide <br /> <br />URS Greiner Woodward Clyde <br /> <br />A Division of URS Corporation <br /> <br />Mr. R.B. "Monk" lowell, President <br />Model Land & Irrigation Company <br />2639 Delagua <br />Trinidad, CO 81082 <br /> <br />Subject: <br /> <br />Feasibility Study Report, Colorado Water Conservation Board, Black Hills (Model) <br />Dam, near Trinidad, Colorado <br />Project No. 68.00044333.00 <br /> <br />Dear Mr. Jowelt: <br /> <br />This letter summarizes the response to comments on the feasibility study review and loan application <br />by Mr. Bill Green of the Colorado Water Conservation Board (CWCB). Mr. Green provided his <br />comments (see attached) on the revised feasibility study report (submitted on February 2) and the <br />loan application. The changes to the feasibility study report are to be incorporated by replacing <br />pages in the existing report without re-issuing the entire report, as described below: <br /> <br />Comment No.1: The priority date is corrected to 1865. Replace page 4-1 with the attached page. <br /> <br />Comment No.2: The last sentence of the first paragraph has been revised and the year clarified. <br />Replace page 4-3 with the attached page. <br /> <br />Comment No.3: The paragraph on Embankment Modifications (page 6-4) describes the work <br />required for the breach repair. <br /> <br />Comment No.4: The work task "Embankment Replacement" has been a9ded to the list on page 7- <br />1. Replace page 7-1 with the attached page. <br /> <br />Comment No.5: The reference to "Conservation District" on page 8-1 has been changed to <br />"Conservancy District". Replace page 8-1 with the attached page. <br /> <br />Comment No.6: Table 8-4 has been changed to include a Debt Service Reserve Fund. Replace <br />Table 8-4 with the attached, revised Table 8-4. <br /> <br />Comment No.7: The paragraph on the net value of the agricultural production comparison to total <br />project cost has been revised. Replace pages 9-1 and 9-2 with the attached pages. <br /> <br />Comment No.8: The last paragraph on page 10-1 has been revised with "annual project costs" in <br />lieu of "loan replacement costs". Replace page 10-1 with the attached page. <br /> <br />I\DEN6\PROJECTSIWPMASTERIPROJECTSI44333\LE24.doc 03/09/00 J J :37 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.