Laserfiche WebLink
<br />t <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF cOLORl\DO <br /> <br />. <br /> <br />Roy Romer <br />Governor <br /> <br />J~mes S. Lochhe~d <br />Executive Director, DNR <br /> <br />D~ries C. Lile, PE. <br />Director, CWCB <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Kent Holt, Division 6 Engineer's Office <br />Eric Kuhn, Colorado River Water Conservation District <br />Keith Pankey, Smith Ditch Corp. <br />David Smith, Board Member <br /> <br />FROM: <br /> <br />Bill Green <br /> <br />DATE: <br /> <br />August 15, 1997 <br /> <br />RE: <br /> <br />Smith Ditch Feasibility Report <br /> <br />Attached is a letter from R.E. Florida, the NRCS design engineer for the Smith Ditch <br />diversion structure. The letter provides some additional information which was not <br />included in the July 1997 feasibility report relative to the rationale for the design of the <br />new structure. You may want to attach this document to the feasibility report which was <br />sent to you last month. <br /> <br />cc: Bill Stanton, CWCB <br />Mike Serlet, CWCB <br />Dennis Davidson, Smith Ditch Corp. <br />John Fetcher, Upper Yampa WCD <br />R.E. Florida, Natural Resources Conservation Service (w/o encl.) <br />