My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153787 Articles of Incorporation
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C153787 Articles of Incorporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 3:28:48 PM
Creation date
4/5/2007 9:55:53 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153787
Contractor Name
Smith Irrigation Ditch
Contract Type
Loan
Water District
44
County
Routt
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />721 Centennial Building <br />131 3 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />~/( <br />STATE OF COLOMDO <br />I) <br /> <br />Roy Romer <br />Governor <br /> <br />Mr. John Fetcher <br />Upper Yampa Water Conservancy District <br />POBox 880339 <br />Steamboat Springs CO 80488-0339 <br /> <br />James S. Lochhead <br />Executive Difedor. DNR <br /> <br />Daries C. Lite. PE. <br />Director. CWCS <br /> <br />Re: Smith Ditch Project <br /> <br />Dear John: <br /> <br />Per our telephone conversation oflast week, I'm enclosing a suggested outline for the <br />Smith Ditch feasibility study which we understand will be prepared by Fetcher Engineering <br />on a pro bono basis. I'm also enclosing a copy of the updated Construction Fund <br />Guidelines which explains the Construction Fund program and provides a reference <br />document for the preparation of feasibility studies (see Sections 1.0, 2.0, and 4.0.) <br /> <br />We don't anticipate that this feasibility study would be a very lengthy document but it <br />should, as a minimum, describe the project sponsor(s), provide a good description of the <br />proposed project including design layout and costs, suggest a sound financial plan for <br />paying and financing all costs associated with a rehabilitated Smith Ditch, and describe all <br />institutional considerations necessary for project implementation such as permitting, <br />--- .-- contracting, and court actions: <br /> <br />I anticipate setting some time aside in the next few weeks to give you a hand in putting <br />this together so that we could make a formal request to the Board for funding under the <br />Small Water Projects Account in May. Please let me know if you have any questions on <br />the enclosures or if I can be of any further assistance to you at the present time. <br /> <br />Sincerely, <br /> <br />~4 <br /> <br />William E. Green, P.E. <br />Project Planning and <br />Construction Manager <br /> <br />cc: Bill Stanton <br /> <br />Enclosures <br /> <br />,;' <br />
The URL can be used to link to this page
Your browser does not support the video tag.