My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01859
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01859
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2011 2:20:47 PM
Creation date
4/5/2007 9:55:49 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153639L
Contractor Name
New Cache La Poudre Irrigating Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 93-1273
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />721 State Centennial Building <br />1313 Shennan Street <br />Denver. Colorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 8664474 <br /> <br />STATE OF COLORADO <br /> <br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />Roy Romer <br />Governor <br /> <br />July 28, 1994 <br /> <br />1 ames S. Lochhead <br />Executive Director, DNR <br /> <br />Daries C. Lile, P.E. <br />Director. CWCB <br /> <br />Mr. Brian Zick <br />The Engineering Co. <br />23 10 East Prospect <br />Suite B <br />Fort Collins, CO 80525 <br /> <br />Dear Mr. Zick: <br />We have reviewed the second draft of the Feasibility Study for Rehabilitation of Main <br />Canal Diversion Structure for the New Cache la Poudre Irrigating Company (NCLPIC) which <br />you recently submitted to us. Based on that review and on our meeting of June 14, we have the <br />following comments: <br /> <br />1. In the second paragraph, on page I-II, the New Cache la Poudre Reservoir <br />Company is mentioned but not described nor is there any explanation of the <br />relationship between the irrigating company and the reservoir company; <br /> <br />2. Page 2-11 suggest you insert the phrase "as reported in the 1992 financial report" <br />at the end of the last sentence per your own markup; <br /> <br />3. Under "Water Rights", on page 2-IV, storage decrees are not mentioned as was <br />suggested in our meeting of June 14. If the NCLPIC does not own the storage <br />rights, this should be explained in the report; <br /> <br />4. On page 3-IV, there is no explanation as to whether "Total Diverted Volume" <br />includes both direct flow and storage water; <br /> <br />5. The last sentence, in the third paragraph on page I-VII, talks about possible delays <br />due to a 404 Permit. It was our understanding from our conversation with you <br />that no 404 Permit would be required for this project; <br /> <br />6. At the top of page 4- VII, it appears as if the total cost per share of stock should <br />have been given as $14.72 instead of $74.75; <br />
The URL can be used to link to this page
Your browser does not support the video tag.