My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01859
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01859
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2011 2:20:47 PM
Creation date
4/5/2007 9:55:49 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153639L
Contractor Name
New Cache La Poudre Irrigating Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 93-1273
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Shennan Street <br />Denver, Colorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 8664474 <br /> <br />4// <br />STATE OF COLORADO <br /> <br />. <br /> <br />Roy Romer <br />Governor <br /> <br />December 20, 1994 <br /> <br />James S. Lochhead <br />ExeclJtive Director. DNR <br /> <br />Daries C. Lile. P.E. <br />Director. CWCB <br /> <br />Mr. Don Magnuson, Superintendent <br />New Cache La Poudre Irrigating Company <br />P.O. Box 104 <br />Lucerne, Colorado 80646 <br /> <br />Re: Feasibility Study for Diversion Structure <br /> <br />Dear Don: <br /> <br />As I mentioned to you last Thursday at the construction site, we will release the final payment for the <br />diversion structure feasibility study to the New Cache La Poudre Irrigating Company as requested. I <br />last discussed the feasibility study with Brian Zick of the Engineering Company on October 14th of <br />this year and to date have received no response. We do not feel that payment should be withheld <br />from the Company because of the consultant's failure to make the requested corrections. <br /> <br />We do believe, however, as a matter of professional responsibility, that The Engineering Company <br />should correct the financial analysis (specifically the Annual Financial Schedule) and submit a'revised <br />version of the study to the Irrigating Company and to the CWCB. The financial analysis is a key <br />aspect of the feasibility of a project and a record of that analysis is important for both your files and <br />for ours. <br /> <br />I enjoyed the opportunity to talk with you. We look forward to the successful completion of the new <br />diversion structure as a project in which both the New Cache La Poudre Irrigating Company and the <br />Board can take a great deal of pride. <br /> <br />Sincerely, <br /> <br />73~ <br /> <br />William E. Green, P .E. <br />Project Planning and <br />Construction Section <br /> <br />cc: Chuck Lile, Director <br />Peter Evans, Deputy Director <br />Bill Stanton, Chief of Planning and Construction <br />Mike Serlet, Planning and Construction <br />Brian Zick, "The Engineering Company <br /> <br />w: \wctrans\nc\pfeas <br />
The URL can be used to link to this page
Your browser does not support the video tag.