My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150002 Application
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150002 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2011 3:34:40 PM
Creation date
4/5/2007 9:55:49 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150002
Contractor Name
Grand Valley Water Users' Association
Contract Type
Grant
Water District
0
Bill Number
SB 97-8
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Grant Application <br />Grand Valley Water Management Project <br /> <br />8 <br /> <br />miles of the canal, beginning at Big Salt Wash. Except for the addition of automation devices, no <br />changes are needed to these 9 checks. <br /> <br />Pump Station. Studies estimate that an additional 11,000 acre-feet could be saved by the <br />installation of a pump station at Highline Lake. These savings would result from improved ability <br />to balance irrigation supply and demand. Water in excess of irrigation demands would be <br />temporarily stored in Highline Lake and pumped into the canal to meet peak demands. Operation <br />of this new pump station would cause changes in water levels at Highline Lake State Park. The <br />Colorado Division of Parks and Outdoor Recreation have been consulted and are receptive to <br />cooperating in this initiative. <br /> <br />Bypass. This pipeline would provide increased flexibility to spill unneeded irrigation water <br />diverted into the canal at the Grand Valley Project Diversion Dam back to the IS-mile reach. <br />This would require installing a pipeline from the canal to the river, just east of Palisade. Obtaining <br />easements for this pipeline would require approval oflandowners. <br /> <br />Automation Devices. To enable the GVWUA to more efficiently operate the improved canal <br />system, automated controls would be needed. Computer hardware, software and communication <br />systems would be provided. <br /> <br />6. Will the acquisition of additional water rights be necessary? <br />YES _ NO ----X-. If"YES", please explain. <br /> <br />7. Please list the names and addresses of any technical or legal consultants retained to <br />represent the applicant or to conduct investigations for the proposed project: <br />Name Address <br />Bureau of Reclamation P.O. Box 60340 <br />Grand Junction, CO 81506 <br /> <br />8. List any feasibility studies or other investigations which have been completed or are now <br />in progress for the proposed project: (Please submit one copy of each completed study <br />with this application): <br /> <br />Grand Valley Water Management Study - in progress. Being conducted by the Bureau of <br />Reclamation in cooperation with the Grand Valley Water Users Association. <br />
The URL can be used to link to this page
Your browser does not support the video tag.