<br />CDM Camp Dresser & McKee lnc. <br /> <br />T; Crumpton (9/5/95) <br />Page Number 8 <br /> <br />Highway Administration). <br /> <br />Wetlands/Riparian Delineation - Wetland delineation, of areas previously inaccessible due to <br />high water in Plateau Creek, has been completed. The wetland areas have been flagged and <br />mapping operations are underway. The high spring runoff resulted in relocation of several <br />wetland areas due to stream channel changes. Surveying and mapping should be completed <br />within the coming month. <br /> <br />Neotropical Migratory Bird Habitat - As with the wetland delineation effort, some areas of <br />potential neotropical migratory bird habitat were inaccessible due to high water. The habitat <br />investigation in these areas was completed and the resources were flagged and described. <br />Mapping of bird habitat based on biologists field work is underway and should be completed <br />within the next month. <br /> <br />Biological Assessment (BA) Field Investigations - Field surveys were completed for the Uinta <br />Basin hookless cactus, Wetherill milkvetch and Natarita milkvetch. These surveys were <br />necessary for the BA and involved inspection of the dry, upland portions of the alignment <br />which have not been previously investigated. Previously identified populations of the cactus <br />were confirmed in the vicinity of Jerry Creek Reservoirs, but no more populations or <br />individuals of populations of these species were observed along the existing alignment. In the <br />future, it may be necessary to examine applicable sections of the preferred alignment if it is <br />located more than 50-feet from the existing alignment. <br /> <br />Cultural Investigations - The Class I Cultural Inventory was completed and submitted to the <br />BLM for review. The study identified three cultural sites and one potential paleontological <br />site in the vicinity of the existing pipeline alignment. These resources may require some <br />minor adjustments to the preferred alignment and monitoring during construction. <br /> <br />Out of Scope Work <br /> <br />So that the District can be informed of out-of-scope items to be included in the remaining <br />Phase I upper limit, this report will identify every month any such work that has come up, <br />together with a cumulative total for all such out-of-scope work. <br /> <br />Month Item est cost act cost cum cost <br />Feb 95 NOI - Mailing List $2,500 $ 441 $441 <br />Apr 95 WTP - SDWA $ 500 $941 <br />May 95 Tunnel Condo Assess $2,060 $ 746 $1,687 <br />May 95 Coal Seam Subsidence $2,200 $1,551 $3,238 <br />June 95 Coal Seam Subsidence $1,622 $4,860 <br />July 95 Flycatcher Survey $10,000 $3,861 $8,721 <br />