My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01852
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:12:17 AM
Creation date
4/5/2007 9:55:41 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150026
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 99-173
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CDM Camp Dresser & McKee lnc. <br /> <br />T. Crumpton (9/5/95) <br />Page Number 2 <br /> <br />the EA. <br /> <br />Steve LaBonde updated the Board on the results of a second meeting with the Grand Val1ey <br />planning agencies regarding the Pearse Report (see "Other Meetings" below). Major issues <br />include the question of how Clifton fits into the overal1 demand picture since their p~aking <br />factor is larger than Ute Water's and the potential exists to utilize the Clifton water treatment <br />plant in the future and blend water. An intergovernmental agreement to utilize irrigation <br />water for this purpose whenever available could also affect overall demands. <br /> <br />Steve LaBonde also reminded the Board of the upcoming BLM Public Demand Workshop <br />scheduled for August 8, 1995 and encouraged Board attendance to enhance face to face <br />discussions with potential objectors and stakeholders. <br /> <br />Carl Houck introduced the two out-of-scope contractual issues that will be coming up for <br />Board review in September. These are the costs associated with the Public Demand <br />Workshop required by the BLM and the additional geotechnical work associated with locating <br />the best tunnelling route between Plateau Canyon and 1-70. The actual costs for the Public <br />Demand Workshop will be available for discussion as a contract amendment or for inclusion <br />in the remaining funds from Phase I. The Board has several options to consider regarding <br />additional tunnel investigations, but CDM has recommended the least costly level of <br />additional investigation and it is necessary to proceed no later than October with this work to <br />ensure that it will be of benefit in finalizing costs for the EA. <br /> <br />The Board was informed by Larry Clever of recent objections raised by the Town of Coil bran <br />on the Collbran Project Privatization process. Steve LaBonde added to Larry Clever's <br />discussion on the Town of Collbran by making it clear that the perception of a "back room" <br />political deal for privatizing the Col1bran project was starting to alienate the Town of collbran <br />and others in the Plateau Val1ey. Steve indicated that a failure to take some action relative to <br />this issue could result in the EA process being upgraded to an EIS with resulting impacts to <br />the schedule and cost of getting through the NEP A process. The Board of Directors indicated <br />that the Manager should meet with Bruce Smith (Town of Collbran - Manager) as soon as <br />possible to try and come to resolution on Town of Col1bran issues. <br /> <br />BLM Meetings <br /> <br />The monthly BLM Coordination meeting was held on August 8, .1995. The meeting was <br />attended by Catherine Robertson, and Dave Stevens of the BLM, Tom Crumpton and Larry <br />Clever of Ute Water, Tom Charles of CDM, and Steve Jamieson of GEL The meeting <br />focused on issues expected to arise in upcoming USFWS meetings associated with Section 7. <br />The BLM requested clarification on the BOR junior storage filing in Vega and how it harms <br />Ute Water's interests. Tom Crumpton explained the background behind the filing. Since the <br />new filing would have piscatorial, municipal, and industrial uses associated with it, the BOR <br />could fill the right and release it in lieu of water dedicated strictly for power. It is viewed as <br />
The URL can be used to link to this page
Your browser does not support the video tag.