My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01852
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:12:17 AM
Creation date
4/5/2007 9:55:41 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150026
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 99-173
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CONCLUSIONS <br /> <br />The following paragraphs summarize CWCB staff conclusions with respect to the Plateau <br />Creek Pipeline Replacement Project based on the information in the sources listed in the <br />Introduction to this report: <br /> <br />1. The District's preferred alternative from the Environmental Impact Statement, <br />Alternative A, is capable of meeting the project objective of replacing the existing <br />pipeline with a facility having sufficient capacity to meet projected year 2045 peak <br />demands. It has the lowest life cycle cost and the least cost per acre-foot of the three <br />alternatives, which meet the project purpose. The District has adequate water rights <br />for operation of the project. <br /> <br />2. The overall environmental impact of the project is relatively low and most impacts <br />can be minimized or mitigated. Depletions to the Fifteen-Mile Reach of the Colorado <br />River will be offset by the Reasonable and Prudent Alternative developed in the <br />Section 7 consultation process <br /> <br />3. The District's current financial condition is strong based on the indicators in Table 9. <br />The 35-year financial projections prepared by the District staff indicate that debt <br />service coverage will be adequate for the entire period of debt retirement on all <br />Construction Fund loans. Expenditures are projected to exceed revenues for several <br />years during the period of debt retirement but it does not appear as if financial <br />reserves will be drawn down to a level that would lead to concern. <br /> <br />4. The District's financial projections assume a rate increase, or series of rate increases, <br />in the next several years such that the average residential water bill will increase from <br />about $20 to $25 per month. This appears reasonable relative to the rates of other <br />water providers in the state and indicates that the proposed project is economically <br />feasible in terms of the impact on residential water users. <br /> <br />-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.