My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01852
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:12:17 AM
Creation date
4/5/2007 9:55:41 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150026
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 99-173
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />increase to a maximum amount of about $32 million in the year 2000. However, <br />expenditures will exceed revenues in the years 2000 to 2006 drawing down reserves to <br />about $16 million in 2007. Reserves reach a minimum of about $15 million in 2011 and <br />increase significantly thereafter. <br /> <br />The projections also indicate that the average residential water bill will increase from <br />about $20 per month to $25 per month, or 25 percent. The District's water rates have not <br />been adjusted since 1984. <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.