<br />. . <br /> <br />Jack Yates <br />October 19, 1998 <br />Page 4 <br /> <br />SillviMAR Y <br />Del-Mont will provide the services related to the Cottonwood Creek pipeline replacement, <br />including the evaluation of hydroelectric potential, as summarized below: <br /> <br />Description DMFee Fees To <br /> Others <br />Hydroelectric Evaluation $2,000 (lump sum) <br />Pipeline Geotechnical Evaluation $8,500 (time & mat.) <br />Pipeline Design $74,800 (lump sum) -- <br />Pipeline Permitting (high est.) $10,000 (time & mat.) $10,000 (time & mat.) <br />Pipeline Construction Services $26.000 (time & mat.) $30.000 (time & mat.) <br />Subtotal Lump Sum $76,800 <br />Subtotal T & M $36.000 $48.500 <br />Total $112,800 $48,500 <br />Total Combined Fees (all) $161,300 <br /> <br />As is our usual practice, invoices are submitted monthly for work performed and are payable in <br />30 days. Invoices that are not paid in 30 days are subject to interest charges of 1% per month. <br />The lump sum portions of the project will be invoiced based on the percentage of the work <br />completed, while the time and materials portions will be based on actual time expended and in <br />accordance with our standard Schedule of Fees dated March 9, 1998. Time and materials work <br />performed after March 7, 1999 will be based on our annually updated Schedule. <br /> <br />SCHEDULE OF SERVICES <br />We can start work immediately upon receipt of your authorization to proceed. To allow the <br />pipeline design and environmental work to proceed through the winter, field efforts need to <br />begin immediately. It is possible that the conditions, such as snow cover, would prohibit us from <br />proceeding until next spring. We will do what we can to avoid this in order to complete our <br />design by March 1999. If the field work is delayed, the design will also be delayed and the <br />project will probably need to be constructed in the year 2000. <br /> <br />EXIllBIT "A" <br />We incorporate as part of our Agreement the attached Exhibit "A" excerpted directly from the <br />"Standard Form of Letter Agreement Between Owner and Engineer for Professional Services" <br />prepared and issued as noted on the cover sheet. This will clarify an engineer's customary <br />responsibility during the construction phase. <br />