My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01846
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01846
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:31 AM
Creation date
4/5/2007 9:55:35 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0015X
Contractor Name
Powderhorn Metropolitan District No. 1 and No. 2
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. F <br /> <br />".z :.- ~ . <br /> <br />Colorado Water Conservation Board <br />Project No. POWD-5K4E-Ol <br />October 28, 1996 <br />Page 3 <br /> <br />Selected Plan Description - This section will describe the selected alternative proposed and a <br />description of the items to be considered for construction and feasibility of the project. This <br />would include design criteria, land requirements, estimate for the cost of the project and other <br />related items. <br /> <br />Exhibits - Exhibits and documentation will be included within the feasibility report. This will <br />include the District's resolution by the Board of Directors and other related documentation and <br />supporting documents to the other sections of the report. <br /> <br />The following provides the projected cost for the feasibility study: <br /> <br />Feasibilitv Studv Estimated Cost <br /> <br />Field Services <br /> <br />$ 7,000.00 <br /> <br />Survey ($ 5,250.00) <br />Geotechnical ($ 1,750.00) <br /> <br />Water Rights & Water Storage Requirements <br /> <br />$ 1,000.00 <br /> <br />(Includes Services/Coordination with District's Water Attorney) <br /> <br />Study Report <br /> <br />$ 6,000.00 <br /> <br />(Includes Writing, Evaluation of Alternates, Preliminary <br />Layout/Design of Selected Alternate, Cost Estimate, Exhibits, <br />Assembly of Report, etc.) <br /> <br />Meetings & Coordination <br /> <br />$ 500.00 <br /> <br />Expenses & Miscellaneous <br /> <br />$ 1,000.00 <br /> <br />Reproduction, Printing, Project Expenses, Miscellaneous <br /> <br />Total Projected Feasibility Study Cost <br /> <br />$15,500.00 <br /> <br />The projected time frame for completing the feasibility study is 90 calendar days following <br />authorization to proceed. The time frame will be subject to winter weather conditions which <br />could delay the necessary field investigations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.