Laserfiche WebLink
<br />. F <br /> <br />".z :.- ~ . <br /> <br />Colorado Water Conservation Board <br />Project No. POWD-5K4E-Ol <br />October 28, 1996 <br />Page 3 <br /> <br />Selected Plan Description - This section will describe the selected alternative proposed and a <br />description of the items to be considered for construction and feasibility of the project. This <br />would include design criteria, land requirements, estimate for the cost of the project and other <br />related items. <br /> <br />Exhibits - Exhibits and documentation will be included within the feasibility report. This will <br />include the District's resolution by the Board of Directors and other related documentation and <br />supporting documents to the other sections of the report. <br /> <br />The following provides the projected cost for the feasibility study: <br /> <br />Feasibilitv Studv Estimated Cost <br /> <br />Field Services <br /> <br />$ 7,000.00 <br /> <br />Survey ($ 5,250.00) <br />Geotechnical ($ 1,750.00) <br /> <br />Water Rights & Water Storage Requirements <br /> <br />$ 1,000.00 <br /> <br />(Includes Services/Coordination with District's Water Attorney) <br /> <br />Study Report <br /> <br />$ 6,000.00 <br /> <br />(Includes Writing, Evaluation of Alternates, Preliminary <br />Layout/Design of Selected Alternate, Cost Estimate, Exhibits, <br />Assembly of Report, etc.) <br /> <br />Meetings & Coordination <br /> <br />$ 500.00 <br /> <br />Expenses & Miscellaneous <br /> <br />$ 1,000.00 <br /> <br />Reproduction, Printing, Project Expenses, Miscellaneous <br /> <br />Total Projected Feasibility Study Cost <br /> <br />$15,500.00 <br /> <br />The projected time frame for completing the feasibility study is 90 calendar days following <br />authorization to proceed. The time frame will be subject to winter weather conditions which <br />could delay the necessary field investigations. <br />