My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01843
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01843
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
4/2/2007 3:06:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150028
Contractor Name
Colorado Division of Wildlife
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />After completion of this task CDOW will be provided with 5 copies of; current concept <br />drawings, meeting minutes, conceptual level opinions of probable construction costs <br />(for Phases I and II) and a report on the issues and solutions identified in this task for <br />Phase I facilities and a listing of the considerations to be made for future expansion. <br /> <br />e <br /> <br />All team members will be involved in this effort on an as needed basis. <br /> <br />4) Development of Construction Documents to 30% level <br /> <br />This task will focus on the engineering design of the Phase I facilities At this stage of <br />project development the efforts will be directed towards the design and drafting of items <br />needed to convey the intent of the design such as materials, component sizing and <br />configurations of the proposed facilities. <br /> <br />Products delivered in this task will include half size (11" by 17") drawings (an <br />anticipated sheet count and makeup of the drawing submittal is shown in the fee <br />estimate for this task), a preliminary drainage report/plan (if required), an outline of the <br />technical specifications, a preliminary opinion of probable construction cost and an <br />Operational Considerations Report (to assist in the evaluation of the design relative to a <br />operation). . <br /> <br />The documents (5 sets) will be submitted to CDOW in advance of Task 5 which <br />includes a value engineering review of the systems proposed for the facility. <br /> <br />5) Value EnQineerinQ and Submittal Review <br /> <br />This task will be conducted as a two day meeting with CDOW in Denver. We would <br />propose that the first part of this meeting be directed towards a value engineering <br />review process during which each component and system presented in the 30% <br />submittal is analyzed relative to function, operation and construction economies. After <br />completing this review we would then review CDOW's comments on the 30% submittal. <br />We propose this approach as some of the comments received during the value <br />engineering process may address CDOW review comments. <br /> <br />Attendance will be limited to two representatives from FishPro. Comments directed <br />towards disciplines not represented at the meeting will be communicated by telephone <br />(during the meeting) to the appropriate discipline representative for resolution. The <br />discussions and comments made during this meeting will serve to guide the <br />development of the final construction documents. <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.