My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01843
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01843
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
4/2/2007 3:06:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150028
Contractor Name
Colorado Division of Wildlife
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF COLORI\DO <br /> <br />. <br /> <br />Roy Romer <br />Governor <br /> <br />MEMORANDUM <br /> <br />J~me5 5, Lochhe~d <br />Executive Director, DNR <br /> <br />DMies C. Lite, P.E <br />DireCor. eweB <br /> <br />FROM: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Bill Stanton, P.E., Chief, Project Planning and constru~fon Section ~? <br />Mike Serlet, P.E., Design and Constructicw. Engineer <br />Bill Green, P.E., Planning Engineer 13{;Y' <br />Sue Uppendahl, Staff Biologist ~ <br /> <br />TO: <br /> <br />DATE: <br /> <br />July 7, 1998 <br /> <br />SUBJECT: <br /> <br />Agenda Item #14,July 13-14, 1998, Board Meeting-. <br />Native Aquatic Species Facility - Status Report on CWCB/CDOW <br />Feasibility Study and MOU <br /> <br />e <br /> <br />FishPro, Inc. of Port Orchard, Washington has commenced feasibility and design <br />work on the Native Aquatic Species Facility for the Division of Wildlife (DOW). A <br />Program Task Verification meeting was held June 29 and 30 at the DOW offices. <br />Discussion items at the meeting, attended by now staff, CWCB staff, and FishPro staff, <br />included: <br /> <br />Project Objectives <br />Permitting <br /> <br />Project Schedule <br />Operation Plans <br /> <br />Project Budget <br />Facility Start-Up <br /> <br />Communications <br />Project Administration <br /> <br />Tasks 1, 2 & 3 of FishPro's "Scope of Work" (attached) are scheduled to be <br />completed prior to the September CWCB Board meeting. These tasks will outline the <br />project objectives, develop a facility site plan, and develop a preliminary operational plan <br />and cost estimates. This information will be presented at the September meeting prior to <br />the Board's decision whether to execute the project MOU between DOW and CWCB. <br /> <br />Mr. Tom Nesler, DOW Native Fish Species Coordinator, and Mr. Ed Frazar, DOW <br />Chief Engineer, will present to the Board in Telluride the project objectives and the <br />preliminary task information developed at the June 29-30 meeting. <br /> <br />Cc: <br /> <br />Eric Hughes, DOW <br />Ed Frazar, DOW <br />Tom Nesler, DOW <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.