Laserfiche WebLink
<br />,r' <br /> <br />STATE OF COLORADO <br />DIVISION OF WILDLIFE <br />Department of Natural Resources <br /> <br />MEMORANDUM <br /> <br />March 25, 1999 <br /> <br />TO: <br />FROM: <br />SUBJECT: <br /> <br />Bill Green - CWCB <br />Ed Frazar - DOW ~ <br />N ASRF Questions <br /> <br />[ ~j,C~~~~~,:'2~} <br /> <br />""" .II\"i"'~ <br />r" "',"'"t;" l''-'}"';;;J <br />C.\I'~~\\ -~ r~~ <br /> <br />Cdt;~~,C:i? W~ie! A <br />~~;.':::'.':a"'.1Ci1 ".iO~.-.... <br /> <br />The following are the answers to your questions in your memo dated March 9, 1999. Please let <br />us know if we can be of further assistance. <br /> <br />y( We have reviewed several cost estimates for the NASRF ranging from about $3.9 million to <br />$6.8 million. Is the work now at a point where the costs are starting to come into focus and <br />is an itemization available for the most recent cost estimate so that it could be included in the <br />feasibility study that we are preparing? <br /> <br />The current cost estimate that you received in February has not been revised. The design is <br />undergoing revisions that will result in minor changes to the total cost. The revised cost <br />estimate will be forwarded upon completion. Below is a summary of costs by major <br />categories and compares the conceptual estimate, revised full build out, and current estimates: <br /> <br /> Revised <br /> Conceptual Design Estimate Current Estimate <br />Description Estimate (1996) (1998) (1999) <br />Site Work 128,700 478,958 527,186 <br />I--~ - <br />Utilities 120,000 135,000 337,375 <br />Residence 102,000 180,540 156,2101 -- <br />Garage & Storage ~ <br />Restoration Center Bldg I 1,212,520 1,478,800 727,971 _ <br />Restoration Center Bldg II 117,000j= 669,956 <br />Quarantine Building 235,200 <br />Garage I Shop Building -- -, 55,000 133,850 <br />Head TanklTreatment I 471,220 <br />Water Supply 180,000 481,0i- -- 367,65-0 <br />Wells 617,000 171,800 <br />-- <br />Outdoor Ponds 348,500 830,000 115,170 -- <br />Effluent Discharge 320,000 222,000 204,900 I <br />Disinfection Station 30,000 <br />~oring and Alarms 50,000 50,000 162,500 <br />~!:)ency Gener~__ =~~~8~15% 153,675 <br />Contingency 918,060 20% 423,846 10% <br /> ---- <br />Engineering 319,921 10% 588,115 11% 588,115 13% <br />Total $3,519,129 $6,096,4 73 $5,250,424 <br /> <br />/ <br />