My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01842
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01842
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
4/2/2007 3:06:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150028
Contractor Name
Colorado Division of Wildlife
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />1313 Sherman Street <br />Denver, Colorado 80203' <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF COLOMDO <br /> <br />. <br /> <br />! '. <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E, Walcher <br />Executive Director, DNR <br /> <br />Peter H. Evans <br />Director, eWeB <br /> <br />To: Peter Evans <br /> <br />From: Bill Green and Mike Serlet .~ y <br />Project Planning and Construction Section <br /> <br />Date: July 15, 1999 <br /> <br />Re: Native Aquatic Species Restoration Facility <br /> <br />In the 1997 Colorado Session Laws, Chapter 168, Section 11 (1), the General Assembly <br />authorized the CWCB to make a grant of not more than $2.0 million from the Fish and Wildlife <br />Resources Account of the CWCB Construction Fund to the Colorado Division of Wildlife <br />(CDOW) for a Native Aquatic Species Restoration Facility (NASRF) in the San Luis Valley. On <br />March 10, 1998, the Board approved in concept a Memorandum of Understanding (MOU) <br />between the. CWCB and the CDOW for the $2.0 million funding with the condition that all <br />feasibility investigations are to be completed to the satisfaction of the Director of the CWCB <br />prior to execution of the MOD. <br /> <br />Feasibility Study <br /> <br />With this memo, we are transmitting the completed feasibility study for the project. Ed Frazar of <br />the CDOW staffhas reviewed the report and concurs in the study conclusions. <br /> <br />The feasibility report provides documentation for the following aspects of the project: <br /> <br />The need for and purpose ofthe project, including production targets and priorities, <br /> <br />The process through which alternatives were evaluated and a final project location and <br />configuration were established, <br /> <br />A detailed description of the selected alternative, <br /> <br />The technical and water rights considerations for project water supply, and <br /> <br />A financial program comparing estimated capital costs with various confirmed sources of <br />funding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.