My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01838
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
4/2/2007 3:05:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153605
Contractor Name
U. S. Bureau of Reclamation
Water District
0
County
Mesa
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,~ <br />.. <br /> <br />.c, ) <br /> <br />OWENS CREEK RESERVOIR <br />1992 APPRAISAL LEVEL STUDY <br />SUMMARY FACT SHEET <br /> <br />CAPACITY ALLOCATIONS: <br />Active Conservation: <br />Inactive: <br />Dead: <br />Total Capacity <br /> <br />22,010 ac-ft <br />3,000 ac-ft <br />230 ac-ft <br />25,240 ac-ft <br /> <br />SPILLWAY 'DATA: I <br />1992 STUDY <br />Probable Maximum Flood <br />Spillway Discharge: <br />Spillway Crest Length <br />Maximum Water Surface Elevation <br /> <br />1967 STUDY <br />Design Flood <br />spillway Discharge <br />Spillway Crest Length <br />Maximum Water Surface Elevation <br /> <br />EMBANKMENT: <br />MaxiIl\.um Height: <br />Crest Length: <br />Crest Width: <br /> <br />165 ft <br />1,700 ft <br />30 ft <br /> <br />Fill Volumes <br />Earthfill: <br />Sand and gravel: <br />Cobble fill: <br />Riprap: <br />other: <br />Total Volume: <br /> <br />1,520,000 cy <br />50,000 cy <br />246,000 cy <br />34,000 cy <br />46.000 Cy <br />1,896,000 cy <br /> <br />OPERATION / YIELD: <br />Study Period: <br />Minimum End Of Month (EOM) <br />Total Firm Yield: <br />Min. EOM omitting '56-'57 <br /> <br />39, 900 cfs~ <br />13 , 94 0 c f s " <br />100 ft <br />8308.8 <br /> <br />6,300 cfs <br />2,000 cfs <br />25 ft <br />8305 <br /> <br />1937-1980 <br />3,200 ac-ft (reached in '57 only) <br />10,200 ac-ft <br />7,400 ac-ft (reached in '7B) <br /> <br />Firm Yield of a 10,000 ac-ft reservoir is 6,000 ac~ft.* <br />Firm Yield of a 20,000ac-ft reservoir is 9,200 ac-ft. <br />Firm Yield of a 30,400 ac-ft reservoir is 11,200 ac-ft. <br /> <br />* Minimum EOM = 1,500 ac-ft <br /> <br />COST: <br />Embankment Dam w/ 4 ft Raise <br />Spillway <br />Outlet Works <br />Mobilization <br />Subtotal <br /> <br />Unlisted Items 10% +/- <br />continqencies 20% +/- <br />TOTAL CONTRACT COSTS <br /> <br />Non-contract costs 42% <br />TOTAL COST <br /> <br />13,740,150 <br />5,657,875 <br />1,957,450 <br />1.050.000 <br />22,405,475 <br /> <br />2,594,525 <br />5.000.000 <br />$30,000,000 <br /> <br />$12.600.000 <br />$42,600,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.