Laserfiche WebLink
<br />.. <br /> <br />:-} <br /> <br />1 <br /> <br />" <br />. ,.. <br /> <br />Plan of Study - Greeley and Loveland Irrigation System Rehabilitation Feasibility Study <br /> <br />Page 5 <br /> <br />3. A comparative evaluation will be performed, with the Company's assistance, which will compare each <br />alternative with all of the other proposed alternatives based on cost, impacts and institutional <br />considerations. <br />4. The project sponsors will be given the opportunity to incorporate their comments and suggestions into <br />the alternative development phase of the study. Two presentations will be given to the Company to <br />incorporate their input into the alternative selection phase. <br /> <br />Products: <br />1. A memorandum will be prepared describing the methods used in evaluating the alternative elements <br />including institutional considerations. <br />2. Formulation of plan alternatives and the identification of a recommended alterative for the project. <br /> <br />Task 6 - Financial Analysis <br />Objective: <br />A detailed financial program is required by the CWCB for project funding. The fmancial program describes <br />fmancing arrangements and the sources and uses of funds for the entire period of dept retirement. <br /> <br />Methodology: <br />1. Identify and describe methods of proposed project fmancing which could include CWCB loan, loans <br />from other agencies, or bank notes. Repayment periods and interest rates associated with each type of <br />fmancing will be described. <br />2. Ultimate sources of funds for repayment of costs will be described in the study report. The repayment <br />funds may include assessments, water sales and grants. <br />3. A detailed schedule of estimated annual revenues and annual expenditures for the entire period of debt <br />retirement will be developed. The annual revenues will be estimated and presented for each source of <br />funds, Annual expenditures will be presented for debt retirement payments for each category of debt, <br />for operation and maintenance costs, and for payments to reserve funds. <br />4. Potential fmancial impacts of the project on the Company's revenue sources will be addressed in the <br />study report. <br /> <br />Products: <br />1. A thorough understanding of the fmancial feasibility of the Company's ability to repay all the <br />reimbursable costs associated with the project. <br />2. A memorandum will be prepared describing the development of the fmancial program. <br /> <br />Task 7 - Study Report <br />Objective: <br />A study report is the formal documentation of the results and conclusions of all tasks performed for the study. <br /> <br />Methodology: <br />1. Incorporate the task memorandums into CWCB report format. The study will be prepared in accordance <br />with Appendix C of the Guidelines for Financial Assistance through the Colorado Water Conservation <br />Board Construction Fund. <br /> <br />F:\PROJECTS\GREELE-l \CWCB\GRELOV.PRO <br />