My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01828
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01828
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:47 AM
Creation date
4/2/2007 3:05:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153749
Contractor Name
DeWeese-Dye Ditch and Reservoir Company
Contract Type
Loan
Water District
12
County
Custer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Ms. Honey R. Moschetti, President <br /> <br />-11- <br /> <br />December 19, 1994 <br /> <br />4. Final Design of Selected Remedial Concept. Final design of the selected remedial <br />concept should be started following the completion of conceptual designs. The <br />objective of the final design would be to develop the documents needed to allow <br />competitive bidding and construction of the preferred alternative. The work would <br />include detailed analyses; preparation of detailed construction drawings, technical <br />specifications, and bidding and contract documents; a final construction cost estimate; <br />and necessary permitting, including SEO approval. <br /> <br />5. Construction of Selected Remedial Concept. Project bidding and construction would <br />follow the completion of the final designs, and would include appropriate construction <br />management and post-construction activities. We would anticipate that the selected <br />design alternative could be constructed in a single construction season. <br /> <br />The above work could be completed so that the project can be reasonably scheduled to begin <br />construction as soon as the late summer and fall of 1996. The schedule could be accelerated or <br />delayed as appropriate to meet project financial constraints and SEO requirements.. <br /> <br />GEl is prepared to provide the DeWeese-Dye Ditch and Reservoir Company with the technical <br />expertise needed to successfully complete this project. More importantly, we understand the <br />delicate relationship that exists between the financial and technical feasibility of a dam safety <br />project. We will work closely with you to develop a project concept and implementation plan <br />that will provide the appropriate balance between dam safety and economic considerations, and <br />meet state dam safety objectives. <br /> <br />We look forward to the opportunity to continue working with you on this project. If you should <br />have any questions, please do not hesitate to contact us. <br /> <br />Sincerely, <br /> <br /> <br />Brian S. Johnson, <br />Project Manager <br /> <br />BSJ:sjc <br /> <br />Attachments <br /> <br />"311IDOREPORT.L TR <br />
The URL can be used to link to this page
Your browser does not support the video tag.