Laserfiche WebLink
<br />MEMORANDUM <br /> <br />TO: <br /> <br />The DeWeese-Dye File <br /> <br />FROM: <br /> <br />Bill Green <br /> <br />DATE: <br /> <br />September 22, 1998 <br /> <br />RE: <br /> <br />Project Update <br /> <br />Brian Johnson of GEl called to let us know they are proposing to start the design work on <br />the DeWeese Dam rehabilitation in October. He has sent a proposal to Ron Dorn at the <br />DeWeese-Dye Ditch & Reservoir Co. for their approval. Construction is still planned for <br />the summer of '99. <br /> <br />I called Ron Dorn who is awaiting a draft contract from us. Steve Cann indicated the <br />contract has been drafted but may require some revisions. I told Dorn we would probably <br />mail a draft to him fairly soon. <br /> <br />Cc: Bill Stanton <br />Mike Serlet <br />Jan lllian <br />Steve Cann, AGO <br />