My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153582 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C153582 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
4/2/2007 3:05:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153582
Contractor Name
Colorado River Water Conservation District
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />." <br /> <br />DRAFf <br />FY 1995 Proposal <br />Yarnpa River Basin Operation and Management Plan <br />and Elkhead Reservoir Enlargement <br />July 27, 1994 <br />Page 6 <br /> <br />. <br /> <br />Task 2 <br /> <br />Lead Federal Agency <br /> <br />As lead federal agency for the Yampa River Operation and Management Plan and <br />the enlargement of Elkhead Reservoir the U.S. Bureau of Reclamation will <br />coordinate all NEP A compliance and federal agency review and permitting activities. <br /> <br />Task 3 <br /> <br />Project Management and Coordination <br /> <br />Overall technical project management will be provided by the Colorado River Water <br />Conservation District. This will include the following work items: <br /> <br />Yampa River Basin Water Resources Operation and Management Plan <br /> <br />Interagency effort to formulate the Plan. <br /> <br />Public information effort within the Yampa River basin. <br /> <br />. <br /> <br />Hydrology consultant support for formulation and evaluation of the <br />Plan. <br /> <br />Interdisciplinary team evaluation of fish passage and survival flows in <br />the Yampa River. <br /> <br />Elkhead Reservoir Enlargement <br /> <br />Complete and submit necessary permit applications. <br /> <br />Identification of technical studies necessary to support the permitting <br />activities. <br /> <br />Securing of funding package for the enlargement of Elkhead Reservoir <br />including local, state and federal funding. <br /> <br />The following activities will be coordinated by the Colorado Water Conservation <br />Board: <br /> <br />Evaluation of options, quantities and character of instream flow protection <br />in the Yampa River for the benefit of the endangered fish under state law. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.