My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01825
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
4/2/2007 3:05:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0061FX
Contractor Name
Craig, City of
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF COLORA.D~:~ <br /> <br />. <br /> <br />- -.i- <br /> <br />/ <br /> <br />Bill Owens <br />Governor <br /> <br />October 18, 1999 <br /> <br />Greg E. Walcher <br />Executive Director. DN R <br /> <br />Peter H. Evans <br />Director, eWeB <br /> <br />Mr. Douglas R. Laiho, P .E. <br />Ayres Associates <br />3223 Arapahoe Avenue, Suite 315 <br />Boulder, CO 80303 <br /> <br />Re: Elkhead Reservoir Project <br /> <br />Dear Doug: <br /> <br />Enclosed per your request is a copy of the-Construction Fund Guidelines describing the <br />CWCB Construction Fund loan program, the requirements for planning studies, and <br />design and construction administration procedures under the loan program. Also enclosed <br />is an application for CWCB funding. <br /> <br />A feasibility study addressing the economic, financial, technical and institutional <br />feasibility of a proposed project is required for any funding request from the <br />CWCB. The study will generally include: <br /> <br />. A description of the need for and purpose of the project, <br /> <br />. A description of the project sponsor(s) to include type of entity, service area and <br />customer base, <br /> <br />. An analysis of alternatives for accomplishing the project sponsor's objective, <br /> <br />. A description of the selected alternative to include a preliminary design, cost <br />estimates and the source(s) of water for the project, <br /> <br />. A description of project impacts and permitting requirements, <br /> <br />. A detailed financial plan to describe the sources of financing for the project and the <br />project sponsor's ability to repay all existi~g and projected debt service, and <br /> <br />. A summary of the institutional considerations (permits, contracts, etc.) required for <br />project implementation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.